7(46)
Date
Rev
Documentnumber
Prepared
Doc respons/Approved
Checked
Reference
1998-05-29
L
1531-BDV BS 101 01 Uen
INSTALLATION INSTRUCTION
Subject responsible
3
HOW TO OPEN THE
CABINET
Unpack the exchange cabinet.
Using a screw driver lift the blue lid. Unscrew the screw
below and remove the cabinets front cover. Check that
everything has been received according to the delivery
note and that nothing has been damaged during the
transport.
4
INSTALLATION
The PBX can be delivered as a customer configured
unit or the add-in boards are delivered separately. The
cabinet is always equipped with a power supply,
suitable for the local mains. Please check the label
stating the permitted mains voltage. The cabinet is to
be mounted on an indoor wall. A mains outlet must be
provided near the equipment and shall be easily
accessible. The premises shall comply with the
following prerequisites:
•
The air shall be free from dust and smoke
•
Environmental conditions according to
ETS 300 019 (1-4) (Temperature shall be
b 5
°
C and +40
°
C and relative humidity
may vary between 15% and 80%)
•
The PBX shall not be exposed to direct sunlight
•
The cable shall preferably run into the PBX from
below the cabinet to ensure sufficient air flow.
4.1
Mounting of the cabinet
Use the enclosed drilling plan and drill four 8 mm
holes. Mount the cabinet by using the enclosed screws
and plugs. Take into consideration the normal working
height above the floor (about 1.30 m to the lower edge
of the cabinet) and leave enough room for access on
both sides of the cabinet.
Overall dimensions of the cabinet:
•
485 x 600 x 134 (H x W x D in mm).
Lift blue lid to access the screw below.
Then turn the screw to loosen the cabinet
cover and take off the cabinet cover.