RS3 RS4 Maintenance 6. Joint #2
RS series Maintenance Rev.3
53
(4) Apply the proper tension to J2 belt and
secure the Joint #2 motor unit.
To do so, pass a suitable cord or string
around the Joint #2 motor unit near its
mounting plate. Then, pull the cord using
a force gauge or similar tool to apply the
specified tension shown in the figure on the
right.
J2 belt tension=100N (10.2 kgf)
Force gauge
(5) Insert the cables to Arm #1.
(6) Connect the connectors.
Connectors X21, X221, XB22
(7) Mount the Arm #1 cover.
For details, refer to
3.1 Arm #1
.
(8) Mount the Arm #1 under cover.
For details, refer to
3.1 Arm #1
.
(9) Perform the calibration of Joint #2.
For details refer to
13. Calibration
.
Содержание RS Series
Страница 1: ...Original instructions Rev 3 ENM226R5366F Industrial Robot SCARA ROBOT RS series MAINTENANCE MANUAL ...
Страница 2: ...RS series MAINTENANCE MANUAL Rev 3 ...
Страница 8: ...vi RS series Maintenance Rev 3 ...
Страница 11: ...RS Maintenance This volume contains maintenance procedures with safety precautions for RS series Manipulators ...
Страница 12: ......
Страница 43: ...RS3 RS4 Maintenance 4 Cable Unit RS series Maintenance Rev 3 33 Continued from the previous page ...
Страница 45: ...RS3 RS4 Maintenance 4 Cable Unit RS series Maintenance Rev 3 35 Continued from the previous page ...
Страница 122: ...RS3 RS4 Maintenance 14 Maintenance Parts List 112 RS series Maintenance Rev 3 ...