26
Installation Instructions - Relay Box for Infrared Cabins
Installation
EN
2
Insert the anchors as needed and screw in the top screw.
Allow the screw to protrude approx. 3 mm so you can hook in the re-
lay box.
3
Route the connection cables through the openings.
Either from below or from the rear.
4
Hook the relay box into the upper screw using the upper mounting hole.
A
Lines with mains voltage, e.g.
mains supply line, heat
B
Lines with low voltage, e.g. sensor
line, S bus (sauna bus)
A
Top mounting hole
B
Lower mounting holes
210
180
3
A
B
A
B
B