Installation Instructions - Relay Box for Infrared Cabins
Installation
EN
Installation
This chapter describes how to connect the relay box’s circuit board lines.
For information on configuration of the control unit's panel, see chapter
You can connect both infrared radiators and infrared foils. Both versions are
referred to as IR emitters in the following section. However, in instances
where different settings must be made, they will be referred to specifically
by name.
Recommended installation sequence
Before commencing installation, ensure that the relay box and the control
unit are mounted. Furthermore, all cabin work must be complete: IR emit-
ter, temperature sensor, lighting, etc.
Complete installation in the following sequence:
Plug the S bus and sensor lines into the relay box.
Connect the consumer lines to the relay box.
Set the DIP switch for the unit address.
Set the jumper for the IR emitter to IR-1 and IR-2.
Set the DIP switch for the channels.
Establish connection to the power supply.
Switch on the relay box and control unit.
Configure the control unit’s channels.
Configure additional settings at the control unit, e.g. target temperature
for emitters.