Hauser
3
–
1
3 - I
NSTALLATION
This section describes the processes used to initially install and configure your
SS500XP or SS2000XP. Once the analyzer arrives, you should take a few
minutes to examine the contents before installing the unit.
This section discusses:
•
Unpacking and inspecting the analyzer
•
Getting familiar with analyzer
•
Installing the analyzer
What Should be Included in the Shipping Box
The contents of the crate should include:
•
The Hauser SS500XP or SS2000XP analyzer
•
CDs; Operator’s Manual and other manuals or documents as
necessary
•
One external serial cable(s) to connect the analyzer to a computer
•
Additional accessories or options as ordered
If any of these contents are missing, contact
Inspecting the Analyzer
Unpack and place the unit on a flat surface. Carefully inspect all enclosures for
dents, dings, or general damage. Inspect the inlet and outlet connections for
damage, such as bent tubing. Report any damage to the carrier.
Installing the Analyzer
Installing the analyzer is relatively easy and requires only a few steps that,
when carefully followed, will ensure proper mounting and connection.
Hauser Class I Division 2 gas analyzers use a non-
incendive protection method, and as such all portions of the local
installation codes apply. The maximum allowed inductance to
resistance ratio (L/R ratio) for the field wiring interface must be
less than 25 μH/Ω. The maximum total loop capacitance shall be
0.27 microfarads
.
Avoid jolting the instrument by dropping it or banging it against a
hard surface. Do not attempt to pick up the instrument using the
sample cell. Either action may disturb the optical alignment.
Содержание SS2000XP
Страница 16: ...SS500XP SS2000XP Gas Analyzer BA02183C 1 12 Endress Hauser THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...SS500XP SS2000XP Gas Analyzer BA02183C A 8 Endress Hauser THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 59: ......
Страница 60: ...www endress com BA02183C 66 EN 01 21...