K
Keys
23
L
Language
35
Length of measuring cables
41
Limit contacts
48, 50, 53
Logbook
78
M
Mains disconnection
9
Maintenance
82
Maintenance contact
34
Measurement displays
25-26
Measuring cable
41
Measuring point sign
6
Measuring system
4
Measuring transmitter supply
11, 16
Medium temperature compensation
37
Menu structure
23
Messages
76
Metal cable gland
17-18
Module FCP1
10-11, 13-14
Module FCXI
11, 16
Module FCYI
13
Module FCYK
11, 15
module FCYP
15
Moisture protection
17, 19
Mounting
7-8
Mounting accessories
8
N
Neutralisation controller
48
O
Operating concept
23-24
Operating elements
22
Operating mode
32
Operation
22-30
Operator level
27
Optocoupler outputs
14-15
Output relays
33
P
Panel installation
8
PARAM key
23
Pass Codes
33
pH electrode
17
Post installation
8
Potential matching pin
18, 32, 57
Power-up
20
Preset buffer calibration
60
PROFIBUS interface
68-75
PROFIBUS-PA
68, 86
Proportional controller
48
Protective wire
9
Pulse-frequency modulation
49
Pulse-length modulation
49
R
Redox electrodes
17
Redundancy measurement
21, 32
Relays
11
Relays allocation
34
Release status
27
Removal
19
Repackaging
19
Repairs
82
Reset
81
Retractable holder
44, 47
S
Safety
3
SCS cleaning
46-47
Sensopac CPA 320
91
Sensor check system (SCS)
41
Service
80-82
Set-up guide
20
Shielding
9
Short-cut to relays
28
Signal damping
35
Simulation
80
Software version
80
Start-up
20-21
Status contact
34
Storage
7
Symbols used
2
Symmetrical electrode connection
18
System set-up
32
T
Technical data
83-86
Temperature compensation
37
Three-level step controller
50
Time
35
Transport
7
Two-circuit measurement
21, 32
Two-range P controller
49
type file
75
Types of controller
48
U
Unpacking
7
Use intended
3
V
VBA junction box
19
Versions available
5
W
Wall installation
7
Warning
78
Weather protection cover
8
Week programme
46-47
Appendix
mycom CPM 152
96
Hauser