4
Installation
4.1
Storage and transport
The packaging material used to store and
transport the instrument must provide shock
and moisture protection. The original
packaging materials offer most effective
protection. The ambient conditions also have
to meet the requirements (see “Technical
data”).
4.2
Unpacking
Inspect for any damaged packaging. The
post office or freight carrier must be informed
of any damage and the supplier must be
notified.
Check that the delivery is complete and
corresponds to your order and the shipping
documents:
• Quantity delivered
• Instrument version according to the
nameplate (see chapter 3.4)
• Accessories (see chapter 3.5.1)
• Operating instructions
• Instrument identification card(s)
Keep the original packaging materials in
case the instrument has to be stored or sent
anywhere at a later date.
If you have any questions, please contact
your supplier or the Hauser sales
agency in your area (see the back of
these operating instructions).
4.3
Mounting
Wall installation (mounting versions A and B)
Insert the screws in the attachment holes in
the housing and secure the instrument as
shown in fig. 4.1.
The holes are covered with plastic caps.
24
7
142
Attachment screw:
∅
6 mm
Plug:
∅
8 mm
Plastic
caps
15
4
100
167
PM
1
52WAN.CDR
∅
8
Fig. 4.1
Dimensions for wall
installation
pm152e04.chp
mycom CPM 152
Installation
Hauser
7