Section 9: Alarm Relay Functions
Instruction Manual
April 2017
LIQ-MAN-56
72
Alarm Relay Functions
A typical application for totalized flow relay activation is controlling chemical dosing in reactors.
A schematic of the Totalizer timer operation is shown:
9.5.2
Setup
Access Totalizer Timers by pressing ENTER/MENU from the main screen and then Program/Relays/
Configure Relay. From the main relay programming screen, program this feature as follows:
1.
Relay:
Assign a relay by highlighting the desired relay 1-4 and press ENTER/MENU.
2.
Type:
Select Totalizer timer as the relay type and press ENTER/MENU.
3.
Assign:
Assign Pulse flow S1 (sensor 1) or S2 (sensor 2) as the measurement input and
press ENTER/MENU.
4.
Active relay after:
Enter accumulated volume (XX.XXXX) and units of measurement
(gal, thousand gal, million Gal, trillion Gal).
5.
On time:
Enter the time in minutes (X.X min) for the relay to remain energized. The
assigned measurement value will be on hold during this time.
6.
Normal state:
Set the normal alarm condition as Open or Closed and press
ENTER/MENU. Program the normal state to define the desired alarm default state to
normally open or normally closed upon power up.
9.6
Interval Timer
9.6.1
Description:
The interval timer august be used for periodic sensor cleaning or periodic process
adjustment. The cycle begins at the Interval time when the switch is turned on. When the
Figure 9-4. Totalizer alarm operation
time
relay on
time
X volume
accumulated
X volume
accumulated
Relay Function
Limits and Selections
Default
Totalizer Based Timer
NA
NA
Activate relay after
0 to 99.9990
10
units
Gal, Liters, cuft,m3 accumulated
E3gal (x1000 gal)
accumulated
On time
0 to 999.9 min
0 min
Normal state
Close/Open
Open
Table 9-5. Defaults and programmable limits
Содержание Rosemount 56
Страница 1: ...Instruction Manual LIQ MAN 56 Rev D April 2017 Rosemount 56 Advanced Dual Input Analyzer ...
Страница 2: ......
Страница 10: ...iv Table of Contents Instruction Manual April 2017 LIQ MAN 56 ...
Страница 30: ...Section 2 Installation Instruction Manual April 2017 LIQ MAN 56 20 Installation ...
Страница 40: ...30 Wiring Section 3 Wiring Instruction Manual April 2017 LIQ MAN 56 ...
Страница 64: ...Section 6 Programming Measurements Instruction Manual April 2017 LIQ MAN 56 54 ...
Страница 76: ...Section 8 Time Proportional Control Instruction Manual April 2017 LIQ MAN 56 66 ...
Страница 124: ...Section 13 Maintenance Instruction Manual April 2017 LIQ MAN 56 114 ...
Страница 126: ...Section 14 Return of Material Instruction Manual April 2017 LIQ MAN 56 116 ...