
78
English
Appendix A (AP.A)
Procedures
P1
Opening shielding panels
Caution:
The side panels provide protection against contact with rotating parts and dan-
ger areas. Before opening this guard, fi rst make sure to switch off the engine and
to remove the ignition key.
• The large shielding panels have a hinge on the top face of the machine. They hinge upwards like
a wing. The hinged panels have a 2.2 m span, so make sure there is ample room (2 m) on either
side of the machine.
(1)
• Before siting the machine, consideration should be given that in the raised position the machine’s
overall height amounts to 2 m.
• After opening the L.H. shielding panel you can see the fuel tank cap of the fuel tank, the fi ller cap of
the hydraulic oil tank, the air fi lter, the hydraulic pump, the feed roller drive components, the quick fi t
couplings of the hydraulic hoses of the discharge conveyor, the drive chain of the discharge conveyor, etc.
• On opening the R.H. shielding panel you can see the belt transmission, the exhaust pipe, belt
tension setting, the feed belt drive chain, etc.
• Each shielding panel is secured in position by a guard latch. This latch is located on the underside of
the guard.
(2)
• Unsnap the rubber guard latch from the clamp.
• At the back of the machine, near the discharge conveyor, a handle is located at either end to
open the shielding panel.
(3)
(1)
(2)
(3)
2.2 m
2 m