Innovating power.
AX M2 Series 3-5 kW | Solar inverter
Solar inverter | V1.7
Control and display elements - Page 42
required. Please refer to
5-2 for detailed
information. Please
select "3P1" in program
28 for the inverter
connected to phase L1,
"3P2" in program 28 for
the inverter connected to
phase L2 and "3P3" in
program 28 for the
inverter connected to
phase L3.
Ensure that you connect
a common power cable
to the units located in the
same phase.
DO NOT connect a
common power cable
between devices on
different phases.
29
Defining battery bank,
cut-off voltage: When
"USE" in menu point
05 is selected,
the cut-off voltage
can be set here.
3KW Pre-setting: 27.0V
5KW Pre-setting: 54.0V
32
Charging conduct or
duration of the bulk
charge.
Charging time
automatic (pre-set)
Minutes
Содержание AX M2 Series
Страница 4: ...Innovating power AX M2 Series 3 5kW Solar inverter Solar inverter V1 7 Safety Page 4 User Manual...
Страница 7: ......
Страница 124: ......
Страница 131: ...Innovatingpower Technical Data Page 129 Solar inverter V1 7...
Страница 132: ......