Safety elements
No.
Description
Cause
Solution
Testing time
Reaction
E20
01
SER Test
SER Test signal unsuccessful
SER short against ground
Check wiring of sensor or bridge
Before closing
A
02
SER too slow
SER reacts too slow
Check wiring of the sensor
Check for reverse polarity of test signal
E21
01
SES Test
SES Test signal unsuccessful
SES short agains ground
Check wiring of sensor or bridge
Before opening
A
02
SES too slow
SES reacts too slow
Check wiring of the sensor
Check for reverse polarity of test signal
E22
01
EMY Test
EMY input to 24V
Check EMY bridge
Check wiring on EMY
Permanently
H
Power supply
No.
Description
Cause
Solution
Testing time
Reaction
E30
01
30 V Error
30 V too low
power failure
Motor overload
Check power supply
Replace hardware
Permanently
A
02
30 V too high
03
Error when switching on
E31
01
24 V General
Error when switching on
Overload, short of the 24V-inputs
(exclusive electric lock, Safety Elements)
Permanently
A
Restart after
10 s.
02
Overvoltage / Undervoltage
E32
01
24 V Safety
Overvoltage / Undervoltage
Overload, short of Safety Elements
Permanently
A
Restart after
10 s.
E33
01
24 V E - Lock
Error
Overvoltage / Undervoltage
Überlast, Kurzschluss Elektroschloss
Permanently
A
Restart after
10 s.
02
Early warning
Overvoltage / Undervoltage
E34
01
24 V CAN
Overvoltage / Undervoltage
Overload, short of external supply CAN
Permanently
A
Restart after
10 s.
ERROR CODES
(DISPLAY)
FAILURE WITH ERROR NUMBER
ECO
ETS – Assembly Buddy
32
Содержание ETS Series
Страница 1: ...ECO ETS ASSEMBLY BUDDY AUTOMATIC SWING DOOR DRIVE SYSTEM TECHNOLOGY FOR THE DOOR...
Страница 5: ......
Страница 12: ...CABLE PLAN ECO ETS 73 MASTER ECO ETS 64 R MASTER ECO ETS Assembly Buddy 12...
Страница 13: ...CABLE PLAN ECO ETS 64 R WITH 24V 48V SIGNAL 13...
Страница 15: ...CABLE PLAN ECO ETS 73 OPTIONAL PRINT 15...
Страница 17: ...CABLE PLAN ETS 73 n ETS 64 n ETS 42 BEA FLATSCAN LZR LASER SENSOR 17...
Страница 20: ...ECO ETS Assembly Buddy CABLE PLAN MOTOR LOCKS WITH DIRECT CONNECTION OF THE COIL 20...
Страница 21: ...CABLE PLAN MOTOR LOCKS WITH OWN EVALUATION CONTROL 21...
Страница 22: ...ECO ETS Assembly Buddy CABLE PLAN MOTOR LOCKS WITH SEPARATE EVALUTATION CONTROL AND POWER SUPPLY 22...
Страница 34: ...ECO ETS Assembly Buddy 34...
Страница 35: ...35...