Before starting the system, carry out the following checks:
1. Check that the inverter is correctly fixed to the wall.
2. Check that the PV string connections have been made correctly.
3. Check that the AC GRID and EPS (if present) connections have been made correctly.
4. Check that the BATTERY connections have been made correctly.
5. Check that the EARTH connection (MANDATORY) has been made correctly.
6. Verify that the ENERGY METER connections have been made correctly.
7. Verify that SMART LOAD connections (if present) have been made correctly.
8. Check that the connection cover is closed and secured with the fixing screws.
If the checks listed above were successful, proceed as follows:
1. Turn on the DC disconnector switch (position 1).
2. Turn on the external main AC line switch.
3. Turn on the AC GRID and EPS (if present) circuit breakers.
4. Turn on the BATTERY circuit breaker (if present) and turn on the HV battery.
5. Wait for the display to turn on.
6. Start the inverter by turning the ON/OFF switch in position 1.
Proceed as follows to switch off the system:
1. Enable the inverter stand-by by turning the ON/OFF switch in the “0” position.
2. Turn off the DC switch (position 0).
3. Turn off the AC GRID and EPS (if present) circuit breakers.
4. Turn off the BATTERY circuit breaker (if present) and turn off the HV battery.
5. Wait for the display to turn off.
6. Do not carry out other operations on the inverter for at least 10 minutes. The inverter
contains capacitors that need a minimum time to discharge.
6.12 System switching on
6.13 System switching off