Installing the IAC
3-32
EATON
Powerware
®
9390 IAC-B and IAC-T Installation and Operation Manual
S
164201590 Rev C
powerware.com
Installation Checklist
-
All packing materials and restraints have been removed from each cabinet.
-
Each cabinet in the UPS system is placed in its installed location.
-
Shipping brackets are installed on the cabinet and bolted to the floor for permanent installations.
-
All conduits and cables are properly routed to the IAC.
-
All power cables are properly sized and terminated.
-
IAC auxiliary contact signal wiring is connected from the IAC to the UPS.
-
A ground conductor is properly installed.
-
Air conditioning equipment is installed and operating correctly.
-
The area around the installed UPS system is clean and dust-free. (The UPS and IAC must be installed on a
level floor suitable for computer or electronic equipment.)
-
Adequate workspace exists around the IAC and other cabinets.
-
Adequate lighting is provided around all UPS system equipment.
-
A 120 Vac service outlet is located within 25 feet of the UPS and IAC equipment.
-
The debris shield covering the IAC cabinet ventilation grill is removed.
-
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.