21.
After wiring the UPS system to the facility power and critical load, be sure to
ground the system according to local and/or national electrical wiring codes.
22.
If wiring interface connections, proceed to paragraph 3.3.5; otherwise, proceed to
Step 23.
23.
When all wiring is complete, reinstall the safety shield panels removed in previous
steps.
24.
Reinstall the door removed in previous steps and secure with the retained
hardware.
25.
Close the door and secure the latch.
3.3.3 Standalone MBP IAC Installation
Use this procedure to install a separately located IAC (see Figure 3-7 and Figure 3-8).
Figure 3-7. 40–80 kVA UPS with Standalone IAC
1.
Verify that the UPS is properly installed and secured. Refer to the applicable
Powerware 9390 Installation and Operation manual, listed in paragraph 1.5, for
installation instructions.
2.
Roll the IAC to the installation area.
3.
If not already open, unfasten the IAC front door latch and swing the door open.