background image

1-1

EATON

Powerware

®

9390 IAC-B and IAC-T Installation and Operation Manual

S

164201590 Rev C

powerware.com

Section I

Installation

Содержание Powerware 9390 IAC-B

Страница 1: ...Powerware 9390 Integrated Accessory Cabinet IAC B and IAC T Configurations Installation and Operation Manual For use with Powerware 9390 40 80 kVA and 100 160 kVA UPS Models...

Страница 2: ...quipment and save this manual for future reference Consignes de s curit CONSIGNES DE S CURIT IMPORTANTES CONSERVER CES INSTRUCTIONS CE MANUEL CONTIENT DES CONSIGNES DE S CURIT IMPORTANTES Powerware is...

Страница 3: ...1 3 2 Unloading the Powerware 9390 IAC from the Pallet 3 1 3 3 IAC Cabinet Installation Maintenance Bypass Configuration 3 5 3 3 1 Line up and Match MBP IAC Installation 3 5 3 3 2 Installing IAC Line...

Страница 4: ...atures 5 1 5 1 1 Maintenance Bypass Configuration 5 1 5 1 2 Parallel Redundant Configuration 5 1 5 1 3 Parallel Redundant Configuration with Maintenance Bypass 5 1 5 1 4 Customer Interface 5 1 5 1 5 I...

Страница 5: ...6 2 Performing Preventive Maintenance 6 1 6 2 1 DAILY Maintenance 6 1 6 2 2 PERIODIC Maintenance 6 2 6 2 3 ANNUAL Maintenance 6 2 6 3 Short Circuits 6 2 6 4 Recycling the Used IAC 6 2 6 5 Maintenance...

Страница 6: ...Table of Contents iv EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 7: ...and Match IAC 3 18 Figure 3 11 40 80 kVA UPM 1 to IAC Joining Brackets 3 20 Figure 3 12 IAC to 40 80 kVA UPM 2 Joining Brackets 3 21 Figure 3 13 100 160 kVA UPM 1 to IAC Joining Brackets 3 22 Figure 3...

Страница 8: ...vi EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 9: ...ethod for removing power from the UPS when using the maintenance bypass to supply the load Parallel Redundant Configuration Module Output Breakers MOB 1 and 2 enable two UPS modules to be paralleled t...

Страница 10: ...Introduction 1 2 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com Figure 1 1 Powerware 9390 IAC...

Страница 11: ...the site for the installation of the IAC It discusses equipment environmental requirements inspecting and unpacking cabinets Chapter 3 Installing the IAC describes how to install and wire the IAC Sect...

Страница 12: ...on the screen or LCD Icon Description Information notes call attention to important features or instructions In this manual the term UPS refers only to the UPS cabinet and its internal elements The t...

Страница 13: ...ins its own energy source batteries The output terminals may carry live voltage even when the UPS is disconnected from an AC source To reduce the risk of fire or electric shock install this IAC in a t...

Страница 14: ...ided UPS operation including UPS cabinet controls functions of the UPS standard features and optional accessories procedures for starting and stopping the UPS and information about maintenance and res...

Страница 15: ...1 1 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com Section I Installation...

Страница 16: ...1 2 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 17: ...Creating an Installation Plan Before installing the IAC read and understand how this manual applies to the system being installed Use the procedures and illustrations in the following chapters to crea...

Страница 18: ...breakers or one feed with two upstream feeder breakers must be provided one for the UPS and one for the IAC bypass input DO NOT use one feed or a single feeder breaker to supply both the UPS and IAC P...

Страница 19: ...damaged cabinet Report any damage to the carrier and contact your Eaton service representative immediately Do not tilt the IAC more than 10 from vertical or the cabinet may tip over 1 Carefully inspec...

Страница 20: ...lation is complete 4 Remove the protective covering from the cabinet 5 Remove the packaging material and discard or recycle in a responsible manner 6 Inspect the contents for any evidence of physical...

Страница 21: ...or suitable for computer or electronic equipment See Table A on page A 6 for equipment weight and point loading Details about control wiring are provided in each procedure Drawing 164201590 7 and Tabl...

Страница 22: ...the bracket to the pallet see Figure 3 2 Remove the rear shipping bracket If installing the cabinet permanently retain the shipping bracket and securing hardware for later use 7 Remove the three rear...

Страница 23: ...IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com FRONT VIEW PALLET FRONT SHIPPING BRACKET SHIPPING BRACKET BOLTS SHIPPING BRACKET BOLTS Figure 3 1 Removing the Front...

Страница 24: ...Installation and Operation Manual S 164201590 Rev C powerware com REAR VIEW REMOVABLE SKID SKID BOLTS 3 PLACES PALLET REAR SHIPPING BRACKET SHIPPING BRACKET BOLTS SHIPPING BRACKET BOLTS Figure 3 2 Re...

Страница 25: ...with external contractor supplied wiring To install a line up and match MBP IAC proceed to paragraph 3 3 1 To install a standalone MBP IAC proceed to paragraph 3 3 3 3 3 1 Line up and Match MBP IAC In...

Страница 26: ...gain access to the inside of the cabinet 6 Remove the field kit from the bottom of the cabinet and retain for later use 7 If necessary remove the cosmetic cover and hanger brackets from the right han...

Страница 27: ...ng the retained hardware reinstall the shipping brackets previously removed to the front and rear of the IAC with the angle facing outward see Figure 3 1 on page 3 3 and Figure 3 2 on page 3 4 20 Secu...

Страница 28: ...ket M4 screws and large nut from the field kit Place one end of the bracket over the bolt on the bottom side of the lower hinge on the IAC and loosely secure the bracket to the hinge with the large nu...

Страница 29: ...t over the door hinge screw holes Replace the screws in the hinges securing the bracket to the cabinets see Figure 3 6 30 Locate the large flat bracket from the field kit Place one end of the bracket...

Страница 30: ...d bottom hinge pivot points then lift the door off Save the retaining screws for reinstallation of the door 4 If not already removed remove the screws securing the internal safety shield panels and re...

Страница 31: ...IB continue to Step 13 otherwise proceed to Step 19 13 Disconnect the single feed jumpers between the bypass input terminals and the rectifier input terminals on the IAC 14 Change UPS wiring for dual...

Страница 32: ...eld panels removed in previous steps 24 Reinstall the door removed in previous steps and secure with the retained hardware 25 Close the door and secure the latch 3 3 3 Standalone MBP IAC Installation...

Страница 33: ...al safety shield panels and remove the panels to gain access to the inside of the cabinet 6 If permanently mounting the IAC proceed to Step 9 otherwise proceed to Step 7 7 Secure the IAC in position b...

Страница 34: ...e the door at the top and bottom hinge pivot points then lift the door off Save the retaining screws for reinstallation of the door 4 If not already removed remove the screws securing the internal saf...

Страница 35: ...ass input terminals and the rectifier input terminals on the IAC 14 Change UPS wiring for dual feed Refer to the applicable Powerware 9390 Installation and Operation manual listed in paragraph 1 5 for...

Страница 36: ...ware 9390 Installation and Operation manual listed in paragraph 1 5 for shutdown instructions 2 If not already open unfasten the IAC front door latch and swing the door open 3 If not already removed r...

Страница 37: ...nal contractor supplied wiring To install a line up and match Parallel IAC proceed to paragraph 3 4 1 To install a standalone Parallel IAC proceed to paragraph 3 4 3 3 4 1 Line up and Match Parallel I...

Страница 38: ...e the door at the top and bottom hinge pivot points then lift the door off Save the retaining screws for reinstallation of the door 7 Remove the screws securing the internal safety shield panels and r...

Страница 39: ...ng M4 screws see Drawing 164201590 5 sheet 2 of 2 17 If not already installed hang the side panels on the hanger brackets and align with the front and rear of the UPMs 18 If not already secured secure...

Страница 40: ...PM to match the thickness of hinge on the IAC Secure the bracket to the UPM using the M4 screw and to the hinge on the IAC using the screw removed in Step 25 see Figure 3 11 27 Locate a large angle br...

Страница 41: ...M4 screw and to the hinge on the UPM using the screw removed in Step 30 see Figure 3 12 32 Locate a large angle bracket M4 screws and large nut from the field kit Place one end of the bracket over the...

Страница 42: ...m The small flat bracket is attached to the cabinet tops first 37 Locate a small flat bracket from the field kit Align the holes in the small flat bracket over the door hinge screw holes Replace the s...

Страница 43: ...ers between the bracket and the top of the IAC to match the thickness of the hinge on the UPM Secure the bracket to the IAC using the M4 screw and to the hinge on the UPM using the screw removed in St...

Страница 44: ...cable Powerware 9390 Installation and Operation manual listed in paragraph 1 5 for shutdown instructions 2 If not already open unfasten the IAC front door latch and swing the door open 3 If not alread...

Страница 45: ...the critical load 16 Proceed to Step 21 17 Route the bypass input cables to the IAC MBP bypass input terminals See Drawing 164201590 6 starting on page A 34 for IAC wiring access information and termi...

Страница 46: ...re properly installed and secured Refer to the applicable Powerware 9390 Installation and Operation manual listed in paragraph 1 5 for installation instructions 2 Roll the IAC to the installation area...

Страница 47: ...o Step 7 7 Secure the IAC in position by lowering the leveling feet until the cabinet is not resting on the casters and the cabinet is level 8 Proceed to paragraph 3 4 4 9 Using the retained hardware...

Страница 48: ...nside the door at the top and bottom hinge pivot points then lift the door off Save the retaining screws for reinstallation of the door 4 If not already removed remove the screws securing the internal...

Страница 49: ...on page A 34 for IAC wiring access information and terminal locations 18 Connect phase A B and C and if required Neutral bypass input power wiring from the source to the IAC MBP bypass terminals 19 R...

Страница 50: ...he door Remove the retaining screws located inside the door at the top and bottom hinge pivot points then lift the door off Save the retaining screws for reinstallation of the door 4 If not already re...

Страница 51: ...t This checklist ensures that you have completely installed all hardware cables and other equipment Completing all items listed on the checklist will ensure a smooth installation Make a copy of the In...

Страница 52: ...xiliary contact signal wiring is connected from the IAC to the UPS A ground conductor is properly installed Air conditioning equipment is installed and operating correctly The area around the installe...

Страница 53: ...__________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________...

Страница 54: ...Installing the IAC 3 34 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 55: ...3 35 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com Section II Operation...

Страница 56: ...3 36 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 57: ...BIB and the UPS rectifier and bypass input terminals are jumpered together If the optional BIB and rectifier input breaker RIB are installed the UPS rectifier is supplied power through the RIB and the...

Страница 58: ...er removed from the UPS without interrupting power to the critical load If the optional BIB and RIB are installed the BIB and RIB are opened to remove power from the UPS Otherwise external upstream br...

Страница 59: ...1 configuration Each UPM shares the load equally If one UPM should fail the remaining UPM assumes the entire load In a 1 1 redundant configuration the maximum load is equal to the maximum load of one...

Страница 60: ...ical load through the MIS The wraparound MBP is open Figure 4 4 shows the path of electrical power through the IAC during redundant operation when bypass is in UPS mode OUTPUT TO CRITICAL LOAD IAC MIS...

Страница 61: ...MOBs may be opened to isolate the individual UPMs The critical load is not protected while the system is in Maintenance Bypass mode Figure 4 5 shows the path of electrical power through the IAC during...

Страница 62: ...Understanding IAC Operation 4 6 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 63: ...rallel Redundant Configuration with Maintenance Bypass MOBs 1 and 2 enable two UPS modules to be paralleled together for redundancy The MBP in combination with the MIS can be used to completely isolat...

Страница 64: ...dual feed systems The BIB provides a single point of input power control to the UPS and easily removes power from the UPS for servicing 5 2 2 Rectifier Input Breaker Maintenance bypass configurations...

Страница 65: ...Indicates the circuit breaker is in the Off position RISK OF ELECTRIC SHOCK Indicates that a risk of electric shock is present and the associated warning should be observed CAUTION REFER TO OPERATOR S...

Страница 66: ...thorough knowledge of UPS operation before attempting to operate any of the IAC controls The IAC can contain the following controls Maintenance Bypass Configuration Maintenance Bypass Switch Standard...

Страница 67: ...ion 5 5 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com MAINTENANCE BYPASS SWITCH MBP MAINTENANCE ISOLATION SWITCH MIS INTERLOCK PLATE Figure 5 1...

Страница 68: ...AC T Installation and Operation Manual S 164201590 Rev C powerware com OPTIONAL BYPASS INPUT BREAKER BIB OPTIONAL RECTIFIER INPUT BREAKER RIB MAINTENANCE BYPASS SWITCH MBP MAINTENANCE ISOLATION SWITCH...

Страница 69: ...EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com MODULE OUTPUT BREAKER 1 MOB 1 SYSTEM LOAD BREAKER SLB MODULE OUTPUT BREAKER 2 MOB 2 Figure 5 3 P...

Страница 70: ...nd IAC T Installation and Operation Manual S 164201590 Rev C powerware com MODULE OUTPUT BREAKER 1 MOB 1 MAINTENANCE BYPASS SWITCH MBP MAINTENANCE ISOLATION SWITCH MIS INTERLOCK PLATE MODULE OUTPUT BR...

Страница 71: ...d CLOSED 3 Start the UPS in Normal mode according to the instructions in the operation chapter of the applicable Powerware 9390 Installation and Operation manual listed in paragraph 1 5 4 Close the fr...

Страница 72: ...eft 9 Open the MIS 10 Open the BIB and RIB if installed 11 Close the front door and secure the latch 5 5 3 Transferring the UPS from Maintenance Bypass C A U T I O N Only trained personnel familiar wi...

Страница 73: ...OSED IAC System Load Breaker SLB if installed CLOSED 3 Start the UPS in Normal mode according to the Multiple Module Parallel Operation instructions in the operation chapter of the applicable Powerwar...

Страница 74: ...IAC Features Options Controls and Operation 5 12 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 75: ...e should be performed by qualified service personnel only LETHAL VOLTAGE PRESENT This unit should not be operated with the cabinet doors open or protective panels removed Do not make any assumptions a...

Страница 76: ...ngs 6 3 Short Circuits Short circuits are not considered normal phenomena in UPS applications Tripping of protective devices due to low impedance short circuits should be thoroughly investigated for d...

Страница 77: ...ating Input Current See Appendix A Table D throughTable I 7 3 IAC Output Operating Output Voltage Nominal 10 15 208 Vac nominal 50 60 Hz 480 Vac nominal 50 60 Hz Operating Output Frequency Range 5 Hz...

Страница 78: ...Product Specifications 7 2 EATON Powerware 9390 IAC B and IAC T Installation and Operation Manual S 164201590 Rev C powerware com This page intentionally left blank...

Страница 79: ...binet IAC This appendix contains the following drawings 164201590 1 Typical Powerware 9390 UPS System with Integrated Accessory Cabinet 164201590 2 Physical Features and Requirements 164201590 3 IAC O...

Страница 80: ...PICAL POWERWARE 9390 UPS SYSTEM WITH INTEGRATED ACCESSORY CABINET BATTERY CABINET 40 80 kVA UPS CABINET IAC MAINTENANCE BYPASS CONFIGURATION Installation Information A 2 EATON Powerware 9390 IAC B and...

Страница 81: ...UPS SYSTEM WITH INTEGRATED ACCESSORY CABINET 164201590 1 BATTERY CABINET 100 160 kVA UPS CABINET IAC MAINTENANCE BYPASS CONFIGURATION 2 of 4 Installation Information A 3 EATON Powerware 9390 IAC B an...

Страница 82: ...RY CABINET 40 80 kVA UPS CABINET IAC 1 1 PARALLEL REDUNDANT CONFIGURATION WITH OR WITHOUT MAINTENANCE BYPASS 164201590 1 BATTERY CABINETS NOT SHOWN 40 80 kVA UPS CABINET 3 of 4 Installation Informatio...

Страница 83: ...CABINET 164201590 1 100 160 kVA UPS CABINET IAC 4 of 4 1 1 PARALLEL REDUNDANT CONFIGURATION WITH OR WITHOUT MAINTENANCE BYPASS BATTERY CABINETS NOT SHOWN 100 160 kVA UPS CABINET Installation Informat...

Страница 84: ...ght Component Model Weight kg lb Shipping Installed Point Loading Powerware 9390 IAC with an MBP and MIS 333 4 735 303 9 670 4 at 76 167 5 NOTES 1 For IAC with a BIB add 6 8 kg 15 lb 2 For IAC with a...

Страница 85: ...m 6 The basic environmental requirements for operation of the IAC are Ambient Temperature Range 0 40 C 32 104 F Recommended Operating Range 20 25 C 68 77 F Maximum Relative Humidity 95 noncondensing T...

Страница 86: ...160 100 160 120 AND 160 160 kVA 480V 480V 120 100 AND 120 120 kVA 480V 480V NOTE 1 A minimum of two separate feeds with upstream feeder breakers or one feed with two upstream feeder breakers must be...

Страница 87: ...00 AND 120 120 kVA 208V 208V NOTE 1 A minimum of two separate feeds with upstream feeder breakers or one feed with two upstream feeder breakers must be provided one for the UPS and one for the IAC byp...

Страница 88: ...breakers or one feed with two upstream feeder breakers must be provided one for the UPS and one for the IAC bypass input DO NOT use one feed or a single feeder breaker to supply both the UPS and the...

Страница 89: ...and one for the IAC bypass input DO NOT use one feed or a single feeder breaker to supply both the UPS and the IAC 2 Move bypass contactor wires to bypass terminals for dual feed 3 If the load require...

Страница 90: ...E8 E12 E9 E10 E11 E12 F AC OUTPUT TO CRITICAL LOAD D E E4 E5 BATTERY CONVERTER INVERTER RECTIFIER NOTE 1 Remove jumper for dual feed 2 If the load requires a neutral a bypass neutral feeder must be su...

Страница 91: ...E4 E5 BATTERY CONVERTER INVERTER RECTIFIER NOTE 1 Move bypass contactor wires to bypass terminals for dual feed 2 If the load requires a neutral a bypass neutral feeder must be supplied WITH UPS SERI...

Страница 92: ...FEED E1 E2 E3 E12 E9 E10 E11 E12 F AC OUTPUT TO CRITICAL LOAD D E E4 E5 BATTERY CONVERTER INVERTER RECTIFIER NOTE 1 Remove jumper for dual feed 2 If the load requires a neutral a bypass neutral feeder...

Страница 93: ...ER RECTIFIER NOTE 1 Move bypass contactor wires to bypass terminals for dual feed 2 If the load requires a neutral a bypass neutral feeder must be supplied SERIAL NUMBER SEVENTH DIGIT AT B OR HIGHER W...

Страница 94: ...E11 E12 A SINGLE FEED JUMPER REMOVE FOR DUAL FEED F AC OUTPUT TO CRITICAL LOAD C D E BATTERY CONVERTER INVERTER RECTIFIER NOTE 1 Remove jumper for dual feed 2 If the load requires a neutral a bypass...

Страница 95: ...eed 2 If the load requires a neutral a bypass neutral feeder must be supplied MOB 1 MOB 2 SLB OPTIONAL F BATTERY BREAKER BATTERY CABINET BATTERY BREAKER BATTERY CABINET IAC ONELINE DRAWINGS C E9 E10 E...

Страница 96: ...IAC bypass input DO NOT use one feed or a single feeder breaker to supply both the UPS and the IAC 2 Remove jumper for dual feed 3 If the load requires a neutral a bypass neutral feeder must be suppli...

Страница 97: ...UPS Standalone Installation 3 Phases 1 Ground C AMPS 300 360 480 Minimum Conductor Size Number per Phase AWG or kcmil each For contractor supplied wiring refer to the applicable Powerware 9390 UPS In...

Страница 98: ...l each 3 0 2 4 0 2 400 2 NOTE Callout letters D and F map to drawing 164201590 3 sheet 10 of 11 Table F INPUT OUTPUT Ratings External Wiring Requirements for Powerware 9390 IAC 40 80 kVA 208V 1 1 Para...

Страница 99: ...tor supplied wiring refer to the applicable Powerware 9390 UPS Installation and Operation manual listed in paragraph 1 5 Wiring for line up and match installation is factory supplied Neutral if requir...

Страница 100: ...h Module 3 Phases 1 Ground D AMPS 278 333 444 Minimum Conductor Size Number per Phase AWG or kcmil each For contractor supplied wiring refer to the applicable Powerware 9390 UPS Installation and Opera...

Страница 101: ...h Module 3 Phases 1 Ground D AMPS 120 144 192 Minimum Conductor Size Number per Phase AWG or kcmil each For contractor supplied wiring refer to the applicable Powerware 9390 UPS Installation and Opera...

Страница 102: ...nstalled a minimum of two separate feeds with upstream feeder breakers or one feed with two upstream feeder breakers must be provided one for the UPS and one for the IAC bypass input DO NOT use one fe...

Страница 103: ...4 375 3 8 Hex E7 Phase B 2 2 500 kcmil 42 4 375 3 8 Hex E8 Phase C 2 2 500 kcmil 42 4 375 3 8 Hex AC Input to Optional RIB E1 Phase A 2 400 500 kcmil 31 1 275 5 16 Hex E2 Phase B 2 400 500 kcmil 31 1...

Страница 104: ...0 kcmil 42 4 375 3 8 Hex BIB 4 Phase B 2 2 500 kcmil 42 4 375 3 8 Hex BIB 6 Phase C 2 2 500 kcmil 42 4 375 3 8 Hex AC Output to Critical Load E9 Phase A 2 2 500 kcmil 42 4 375 3 8 Hex E10 Phase B 2 2...

Страница 105: ...Critical Load E9 Phase A 2 2 500 kcmil 42 4 375 3 8 Hex E10 Phase B 2 2 500 kcmil 42 4 375 3 8 Hex E11 Phase C 2 2 500 kcmil 42 4 375 3 8 Hex Neutral E12 Neutral 16 2 600 kcmil 56 5 500 1 2 Hex Ground...

Страница 106: ...500 kcmil 31 1 275 31 1 275 5 16 Hex 3 8 Hex AC Input to MOB 2 from UPS MOB2 2 Phase A 1 2 0 250 kcmil 1 2 0 500 kcmil 31 1 275 31 1 275 5 16 Hex 3 8 Hex MOB2 4 Phase B 1 2 0 250 kcmil 1 2 0 500 kcmi...

Страница 107: ...4 350 kcmil 20 3 500 M4 Hex AC Output to Critical Load E9 Phase A 1 14 2 0 13 5 120 3 16 Hex E10 Phase B 1 14 2 0 13 5 120 3 16 Hex E11 Phase C 1 14 2 0 13 5 120 3 16 Hex Neutral E12 Neutral 4 2 600...

Страница 108: ...ctifier Input Circuit Breaker Ratings IAC Model Input Voltage Rating 208V 100 kVA 80 Rated 450A 100 Rated 350A 120 kVA 80 Rated 500A 100 Rated 450A 160 kVA 80 Rated 700A 100 Rated 600A Table S Maximum...

Страница 109: ...for the site requirements using the dial on each breaker The MIS and SLB breakers on the 40 kVA IAC are non adjustable 16 The continuous current Ir values for the corresponding lettered adjustment set...

Страница 110: ...EW BOTTOM ENTRY CONDUIT LANDING PLATE FOR AC INPUT AC OUTPUT AND INTERFACE CONNECTIONS REMOVE PANEL TO DRILL OR PUNCH CONDUIT HOLES TOP ENTRY CONDUIT LANDING PLATE FOR AC INPUT AC OUTPUT AND INTERFACE...

Страница 111: ...TER CABINET WIRING ACCESS KNOCKOUTS REMOVE KNOCKOUTS AS REQUIRED TO ROUTE WIRES BETWEEN CABINETS INSTALL NYLON GROMMET AFTER REMOVAL OF KNOCKOUTS INSIDE PANELS HANGER BRACKET LOCATIONS SECURED WITH SC...

Страница 112: ...OM UTILITY A B C OPTIONAL RECTIFIER INPUT BREAKER RIB AC INPUT TO RIB FROM UTILITY A B C GROUND TERMINALS NEUTRAL TERMINALS SEE SHEET 10 of 22 FOR DETAILS SEE SHEET 10 of 22 FOR DETAILS SEE SHEET 9 of...

Страница 113: ...IB TO UPS A B C AC OUTPUT FROM RIB TO UPS RECTIFIER A B C MAINTENANCE BYPASS SWITCH MBP SEE SHEET 9 of 22 FOR DETAILS MAINTENANCE ISOLATION SWITCH MIS OPTIONAL BYPASS INPUT BREAKER BIB SEE SHEET 9 of...

Страница 114: ...s covering wiring terminals must be removed to gain access to terminals 2 160 100 kVA model must be wired for 120 kVA OPTIONAL SYSTEM LOAD BREAKER SLB MODULE OUTPUT BREAKER 2 MOB 2 SEE SHEET 13 of 22...

Страница 115: ...CONFIGURATION WITH MAINTENANCE BYPASS MODULE OUTPUT BREAKER 2 MOB 2 MODULE OUTPUT BREAKER 1 MOB 1 SEE SHEET 14 of 22 FOR DETAILS AC INPUT FROM UPM 2 A B C SEE SHEET 14 of 22 FOR DETAILS AC INPUT FROM...

Страница 116: ...LOAD A B C AC INPUT TO BYPASS FROM UTILITY A B C GROUND TERMINALS NEUTRAL TERMINALS 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MODULE OUTPUT BREAKER 2 MOB 2 MODULE OUTPUT BREAKER 1...

Страница 117: ...ION AC OUTPUT TO CRITICAL LOAD A B C AC INPUT TO BYPASS FROM UTILITY A B C GROUND TERMINALS NEUTRAL TERMINALS 120 100 AND 120 120 kVA 480V 480V 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BY...

Страница 118: ...INALS MAINTENANCE BYPASS SWITCH MBP SEE SHEET 20 of 22 FOR DETAILS MAINTENANCE ISOLATION SWITCH MIS SEE SHEET 20 of 22 FOR DETAILS AC OUTPUT TO CRITICAL LOAD A B C AC INPUT TO BYPASS FROM UTILITY A B...

Страница 119: ...ASS SWITCH MBP SEE SHEET 22 of 22 FOR DETAILS MAINTENANCE ISOLATION SWITCH MIS SEE SHEET 22 of 22 FOR DETAILS AC OUTPUT TO CRITICAL LOAD A B C AC INPUT TO BYPASS FROM UTILITY A B C GROUND TERMINALS MO...

Страница 120: ...208V MAINTENANCE BYPASS CONFIGURATION MIS AND MBP TERMINAL DETAIL AC INPUT FROM UPS PHASE C PHASE B PHASE A MIS AC INPUT TO BYPASS FROM UTILITY PHASE C PHASE B PHASE A MBP AC OUTPUT TO CRITICAL LOAD P...

Страница 121: ...T FROM RIB TO UPS RECTIFIER PHASE C PHASE B PHASE A 160 100 kVA 160 120 kVA AND 160 160 kVA 208V 208V MAINTENANCE BYPASS CONFIGURATION RIB AND BIB TERMINAL DETAIL AC OUTPUT FROM BIB TO UPS PHASE C PHA...

Страница 122: ...120 100 AND 120 120 kVA 208V 208V MAINTENANCE BYPASS CONFIGURATION BIB TERMINAL DETAIL PHASE C PHASE B PHASE A AC OUTPUT FROM RIB TO UPS RECTIFIER PHASE C PHASE B PHASE A AC INPUT TO RIB FROM UTILITY...

Страница 123: ...OB 2 TERMINAL DETAIL IAC POWER TERMINAL LOCATIONS MOB 1 AC INPUT FROM UPM 2 PHASE C PHASE B PHASE A MOB 2 PHASE C PHASE B PHASE A AC INPUT FROM UPM 1 PHASE C PHASE B PHASE A AC OUTPUT TO CRITICAL LOAD...

Страница 124: ...HASE C PHASE B PHASE A SLB 160 100 160 120 AND 160 160 kVA 208V 208V 1 1 PARALLEL REDUNDANT CONFIGURATION SLB TERMINAL DETAIL AC OUTPUT TO CRITICAL LOAD 13 of 22 Installation Information A 46 EATON Po...

Страница 125: ...LLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MOB 1 AND MOB 2 TERMINAL DETAIL IAC POWER TERMINAL LOCATIONS MOB 1 AC INPUT FROM UPM 2 PHASE C PHASE B PHASE A MOB 2 PHASE C PHASE B PHASE A AC INP...

Страница 126: ...UTPUT TO CRITICAL LOAD PHASE C PHASE B PHASE A 120 100 AND 120 120 kVA 208V 208V 160 100 kVA 160 120 kVA AND 160 160 kVA 208V 208V 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MIS AND...

Страница 127: ...PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MOB 1 AND MOB 2 TERMINAL DETAIL IAC POWER TERMINAL LOCATIONS MOB 1 AC INPUT FROM UPM 2 PHASE C PHASE B PHASE A MOB 2 PHASE C PHASE B PHASE A AC...

Страница 128: ...B PHASE A 80 40 80 50 80 60 AND 80 80 kVA 208V 208V 160 100 kVA 160 120 kVA AND 160 160 kVA 480V 480V 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MIS AND MBP TERMINAL DETAIL 17 of 22...

Страница 129: ...1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS MOB 1 AND MOB 2 TERMINAL DETAIL IAC POWER TERMINAL LOCATIONS MOB 1 AC INPUT FROM UPM 2 PHASE C PHASE B PHASE A MOB 2 PHASE C PHASE B PHASE A...

Страница 130: ...PHASE C PHASE B PHASE A 120 100 AND 120 120 kVA 480V 480V 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS OUTPUT AND MBP TERMINAL DETAIL OUTPUT TERMINAL BLOCK 19 of 22 AC INPUT TO BYPASS...

Страница 131: ...B PHASE A 40 40 kVA 208V 208V 80 40 80 50 80 60 AND 80 80 kVA 480V 480V 1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS OUTPUT AND MBP TERMINAL DETAIL OUTPUT TERMINAL BLOCK 20 of 22 AC I...

Страница 132: ...H MAINTENANCE BYPASS MOB 1 AND MOB 2 TERMINAL DETAIL IAC POWER TERMINAL LOCATIONS MOB 1 AC INPUT FROM UPM 2 PHASE C PHASE B PHASE A MOB 2 PHASE C PHASE B PHASE A AC INPUT FROM UPM 1 21 of 22 Installat...

Страница 133: ...1 1 PARALLEL REDUNDANT CONFIGURATION WITH MAINTENANCE BYPASS OUTPUT AND MBP TERMINAL DETAIL AC OUTPUT TO CRITICAL LOAD PHASE C PHASE B PHASE A OUTPUT TERMINAL BLOCK 22 of 22 AC INPUT TO BYPASS FROM U...

Страница 134: ...r interface and control wiring for maintenance bypass configuration Table U TB1 Terminals Maintenance Bypass Configuration IAC Terminal TB1 Name Description 1 MBP Aux Contact NO Contacts used to indic...

Страница 135: ...intenance Bypass IAC Terminal TB1 Name Description 1 MBP Aux Contact NO Contacts used to indicate whether IAC MBP is closed Contacts are closed when MBP is closed 2 MBP Aux Contact Common 3 MOB 1 Aux...

Страница 136: ...overing wiring terminals must be removed or opened to gain access to terminals TERMINAL TB1 INTERFACE AND CONTROL WIRING INSTALLATION NOTES AND TERMINAL LOCATIONS 3 of 7 Installation Information A 58...

Страница 137: ...anel Display Screen unless the alarms are programmed to display the alarm functional name 2 Use twisted pair wires for each alarm input and common MOB 1 AUX 1 CONTACT COMMON MOB 1 AUX 1 CONTACT NC MOB...

Страница 138: ...B1 1 MBP Aux NO UPS TB1 10 Bldg Alm Common IAC TB1 2 MBP Aux Common 013106 B 164201590 7 DESCRIPTION DATE DRAWING NO SHEET REVISION 1 2 3 4 5 7 8 6 TB1 9 10 MAINTENANCE BYPASS CONFIGURATION MAINTENANC...

Страница 139: ...0 MOB 2 Aux 2 Common UPM 1 TB2 1 Bldg Alm 2 UPM 1 TB2 3 Byp UPM 1 TB2 2 Bldg Alm 2 Rtn UPM 1 TB2 4 Byp Common UPM 2 TB2 1 Bldg Alm 2 UPM 2 TB2 3 Byp UPM 2 TB2 2 Bldg Alm 2 Rtn UPM 2 TB2 4 Byp Common 0...

Страница 140: ...Alm IAC TB1 3 MOB 1 Aux 1 NO UPM 1 Can Bridge Card J3 2 Build Alm Common IAC TB1 4 MOB 1 Aux 1 Common UPM 2 Can Bridge Card J3 1 Build Alm IAC TB1 7 MOB 2 Aux 1 NO UPM 2 Can Bridge Card J3 2 Build Al...

Страница 141: ...8 FRONT VIEW RIGHT SIDE VIEW DESCRIPTION DATE DRAWING NO SHEET REVISION Dimensions are in millimeters inches Installation Information A 63 EATON Powerware 9390 IAC B and IAC T Installation and Operati...

Страница 142: ...ION DATE DRAWING NO SHEET REVISION Dimensions are in millimeters inches BOTTOM VIEW OPTIONAL FLOOR MOUNTING SHOWN 2 of 2 Installation Information A 64 EATON Powerware 9390 IAC B and IAC T Installation...

Страница 143: ...f the Product b if the Product is moved to a new location by someone other than an authorized Eaton Customer Service Engineer in the USA or Agent outside of the USA or c if the Product s serial number...