Figure 15: Time diagrams RUNNING 1 TO RUNNING 2 and RUNNING 2 TO RUNNING 1
MOTOR RUNNING 1 TO MOTOR RUNNING 2
See figure 15, left:
•
After a start2 command, K11 and K12 are energized causing K1 to de-energize.
•
When the Interlock2Time has elapsed, K12 is energized causing K2 to energize.
•
When motor starting2 has finished, the end status is reached (MotorRunning2).
MOTOR RUNNING 2 TO MOTOR RUNNING 1
See figure 15, right:
•
After a start1 command, K11 and K12 are energized causing K2 to de-energize.
•
When the Interlock1Time has elapsed, K11 is energized causing K1 to energize.
•
When motor starting1 has finished, the end status is reached (MotorRunning1).
Interlock1Time and Interlock2Time
The setpoints Interlock1Time and Interlock2Time are set via LCU-5. Select
SCU Manager - Module Control
- Settings tab Transfer
5.6.8
Stop/start commands
Stop and start control is possible via LCU-5, see table 28. Select:
SCU Manager - Module Control
.
AuxiliaryRelayK10
AuxiliaryRelayK11
ContactorK1
AuxiliaryRelayK12
ContactorK2
MotorRunning1
Start2
MotorStarting2
MotorRunning2
Start1
MotorRunning2
MotorStarting1
MotorRunning1
MotorStartingK1
MotorStartingK2
ContactorK2