![Eaton Holec Clink II Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/eaton-holec/clink-ii/clink-ii_user-manual_3683038051.webp)
CLINK II SCU MANAGER
functional description scu
version 5.0
51
•
When I
av
< I
n
then:
I
av
= Average motor current
I
x
= Motor current with the biggest deviation compared to I
av
I
n
= Nominal motor current
Trip and warning level are set relatively to I
nominal
. See table 38.
Accuracy
The accuracy of the measured value is ± 5%.
Note
If DriveType = DL1 then Phase Unbalance = 0.
5.8.7
Earth leakage
The purpose of this protection is to switch off the motor in case of impermissible earth leakage currents.
•
The usual setpoint for the trip level is 3% of the nominal motor current with a maximum of 6 A.
•
The warning level is usually set at 80% of the trip level.
•
If the trip level is exceeded, the motor will be switched off after the trip time.
•
If the warning level is exceeded during 1 second there will only be a warning.
5.8.8
Process underload
The purpose of this protection is to monitor the lower load limit determined by the process. For this the Actual
Power is used to determine the actual load.
Trip and warning level are set relatively to the nominal motor capacity.
Table 38: Phase Unbalance Setpoints
Name
Range
Default
Unit
Parameter
type
Phase Unbalance Trip Time
0-100.00
10.00
s
Setpoint
Phase Unbalance Trip Level
0-100
40
%
Setpoint
Phase Unbalance Warning
Level
0-100
20
%
Setpoint
Table 39: Earth Leakage Setpoints
Name
Range
Default
Unit
Parameter
type
Earth Leakage Trip Time
0.05-100.00
0.50
s
Setpoint
Earth Leakage Trip Level
0.3-6.0
1.0
A
Setpoint
Earth Leakage Warning Level
0.3-6.0
0.8
A
Setpoint
PhaseUnbalance
Ix
Iav
–
In
----------------------
100%
×
=