F 17
Marking hydraulic hoses / storage pe-
riod, period of use
A
A number stamped onto the threaded
connection provides information about
the date of manufacture (A) (month /
year)and the maximum pressure permit-
ted for this hose (B).
m
Never install hoses on top of one anoth-
er and always ensure that they are at the
correct pressure.
In individual cases, the period of use can
be stipulated according to experience
and may differ from the following general
indications:
- When producing the hose pipe, the hose (purchased by the meter) should not be
more than four years old.
- The period of use of a hose pipe should not exceed six years, including any possi-
ble storage period.
The storage period should not exceed two years.
Hyd_VB610RH.eps
DHH 09/00 225 BAR
A
B
Содержание V5100TV-H
Страница 2: ...www dynapac com...
Страница 10: ...V 2...
Страница 24: ...A 2...
Страница 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 42: ...C 4 2 1 4 3...
Страница 57: ...D 15 4 Screed heater conventional version 4 1 Switch cabinet for screed heater 30 31 32 35 36 34 33...
Страница 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Страница 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 94: ...D 52...
Страница 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 136: ...E 42...
Страница 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 154: ...F 18 8 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Страница 166: ...F 30 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 168: ...F 32 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 194: ...G 22...
Страница 196: ...www dynapac com...