F 16
m
Always comply with the following instructions when installing and removing hydraulic
hoses:
- Always only use original Dynapac hydraulic hoses!
- Always observe high standards of cleanliness!
- Hydraulic hoses must always be fitted to ensure that in all operating statuses,
- there is no tensile load apart from dead weight.
- there is no compressive load for short lengths.
- any external mechanical impact on the hydraulic hoses is avoided.
- appropriate positioning and fastening of the hoses prevents them from chafing on
components or on each other.
components with sharp edges must be covered when installing hydraulic hoses.
- bending radii are not smaller than the permitted values.
- When hydraulic hoses are connected to moving parts, the length of the hose must
be dimensioned to ensure that the bending radii are not smaller than the permitted
smallest values right across the full range of movement and/or that the hydraulic
hose is not also exposed to tension.
- Fasten the hydraulic hoses to the provided fastening points. the hoses must not be
hindered in their natural movement and change in length.
- Painting the hydraulic hoses is forbidden!
Содержание V5100TV-H
Страница 2: ...www dynapac com...
Страница 10: ...V 2...
Страница 24: ...A 2...
Страница 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 42: ...C 4 2 1 4 3...
Страница 57: ...D 15 4 Screed heater conventional version 4 1 Switch cabinet for screed heater 30 31 32 35 36 34 33...
Страница 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Страница 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 94: ...D 52...
Страница 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 136: ...E 42...
Страница 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 154: ...F 18 8 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Страница 166: ...F 30 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 168: ...F 32 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 194: ...G 22...
Страница 196: ...www dynapac com...