D 24
Item Designation / function
45
- Screed section selection
A
For selecting the screed sections for temperature display and adjustment.
A
The temperature is adjusted for all sections together.
46
- "Energy saving" selection
A
To reduce the heater output.
A
After switching on, the "Energy saving" status (ON/OFF) set during previous
operation is assumed again.
47
- Plus button
A
To adjust the temperature.
48
- Minus button
A
To adjust the temperature.
49
- Enter
A
To confirm the input / temperature change
50
- Standby
A
To switch between standby off / standby on.
51
- Screed section display
A
Displays the selected screed section. The temperature of the selected
screed section is shown in display (52).
A
If no button has been pressed for a long time, the display is off, and the mean
temperature value for all screed sections is shown in display (52). Return to
the basic status takes place after 3 seconds without button actuation.
52
- Temperature gauge
A
Displays the temperature of the selected screed section.
A
If no screed section has been selected or no button has been pressed for a
long time, the mean temperature value for all screed sections is shown.
Return to the basic status takes place after 3 seconds without button actua-
tion.
Содержание V5100TV-H
Страница 2: ...www dynapac com...
Страница 10: ...V 2...
Страница 24: ...A 2...
Страница 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 42: ...C 4 2 1 4 3...
Страница 57: ...D 15 4 Screed heater conventional version 4 1 Switch cabinet for screed heater 30 31 32 35 36 34 33...
Страница 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Страница 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 94: ...D 52...
Страница 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 136: ...E 42...
Страница 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 154: ...F 18 8 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Страница 166: ...F 30 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 168: ...F 32 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 194: ...G 22...
Страница 196: ...www dynapac com...