F 13
A
During operation, bitumen and fine particles enter the tamper frame. Heating keeps
them in a plastic state, thus making them available for lubricating the tamper knife.
When the screed cools down, these substances solidify. They must be liquefied by
heating before the tamper is put into operation again.
- Usually, the only cleaning work required at the end of the day is to operate the
tamper at slow speed for approx. 15 minutes and to spray some separator fluid into
the tamper compartment.
- If the tamper is not to be used for a longer period of time, the tamper compartment
should be emptied as long as the material is still in a liquid state. If necessary,
switch on the heater!
To empty the tamper compartment, the tamper deflector plates (1), (2) of the screed
parts can be loosened:
- Loosen nut (3).
- Loosen screw plug (4) a few turns at slot.
m
Ensure that the screw plug slot is positioned horizontally!
- Allow the tamper to run at low speed for a few minutes.
- Tighten screw plug (4) again.
- Tighten nut (3).
- Check gap dimension between tamper and tamper deflector plate (0.5 mm).
- If necessary, adjust the gap dimension. See chapter E.
A
Also carry out this procedure on all extension parts!
Removing the tamper deflector plates
- Loosen nut (3).
- Loosen screw plug (4) 90° at slot.
- Remove side plates (1a).
- Remove middle plates (2a).
- Swivel tamper deflector plate forwards slightly (out of screw plug) and push deflec-
tor to side out of mounting bracket.
- Reinstall tamper deflector places (1), (2) side plates (1a) and middle plates (2a) in
reverse sequence and tighten using screw plugs.
- Check gap dimension between tamper and tamper deflector plate (0.5 mm).
- If necessary, adjust the gap dimension. See chapter E.
Содержание V5100TV-H
Страница 2: ...www dynapac com...
Страница 10: ...V 2...
Страница 24: ...A 2...
Страница 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 42: ...C 4 2 1 4 3...
Страница 57: ...D 15 4 Screed heater conventional version 4 1 Switch cabinet for screed heater 30 31 32 35 36 34 33...
Страница 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Страница 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 94: ...D 52...
Страница 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 136: ...E 42...
Страница 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 154: ...F 18 8 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Страница 166: ...F 30 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 168: ...F 32 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 194: ...G 22...
Страница 196: ...www dynapac com...