D 28
Via the temperature sensor and flame monitoring system, the electronics monitor gas
heater operation. If there is no stable flame at the ignition burner within 7 seconds,
the electronics indicate a malfunction. The gas supply is interrupted and the red indi-
cator lamps on the ignition box and in the switch cabinet light up.
A
In the event of a malfunction during the switch-on phase, the starting process can be
repeated up to three times. If the malfunction still occurs after three start-ups, the
cause of the malfunction has to be eliminated before starting again.
When the flame is correct, the screed is heated until the temperature sensors in the
individual screeds interrupt the heating process. During the heating phase, the red in-
dicator lamps (54) in the switch cabinet and the yellow indicator lamps on the ignition
boxes (62) indicate a correct flame at the burners.
In the event of a malfunction, the red indicator lamps (56, 57, 58, 59) in the switch
cabinet and the red indicator lamps on the ignition boxes (61) indicate that the flame
at the burners is not correct.
m
The indicator lamps are important for trouble-free operation of the ignition system.
Therefore, defective bulbs should be immediately replaced!
Содержание V5100TV-H
Страница 2: ...www dynapac com...
Страница 10: ...V 2...
Страница 24: ...A 2...
Страница 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 42: ...C 4 2 1 4 3...
Страница 57: ...D 15 4 Screed heater conventional version 4 1 Switch cabinet for screed heater 30 31 32 35 36 34 33...
Страница 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Страница 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 94: ...D 52...
Страница 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 136: ...E 42...
Страница 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 154: ...F 18 8 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Страница 166: ...F 30 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 168: ...F 32 Fuses in the control unit of the screed heater Fuses B B Fuses F A F10 Heater control system 1 F11 Heater OFF 3 B...
Страница 194: ...G 22...
Страница 196: ...www dynapac com...