Service Manual for Flexible Batch Broiler, CE Version
19
6/19/2014
SM-BR-BR-0007
NOTE:
Use Anti-Seize Technologies TFE1400 on
all pipe threads when reassembling the Infrared
Burner gas fittings.
NOTE:
Clean excess silicone sealer from Air Box
and Burner Venturi if reinstalling burner. Reapply
high temp silicone sealer before installing burner.
Lower J Burner Assembly
The Lower J Burner Assembly is located under the
Conveyor and can be accessed at the discharge
end of the broiler and from the front of the broiler.
WARNING
DIsCONNECT THE ELECTRICAL
POWER TO THE BROILER AND
FOLLOW LOCKOUT / TAGOUT
PROCEDUREs.
1. Remove PHU Pan Shelf.
2. Remove Discharge Hood.
3. Remove Discharge Chute.
4. Remove Discharge Pan.
5. Remove the Discharge Grease Pan
6. Remove the Discharge Access Panel. Refer
to the COVERS and PANELS section of the
manual.
7. Remove the Ash Scraper, by pulling thetop of
the Ash Scrapper out, away from the broiler
and lifting it up and out.
8. Remove the Main Grease Pan and V Grease
Pan.
9. Remove Front Panel. Refer to the COVERS
and PANELS section of the manual.
10. Disengage J Burner bracket from stud at
discharge end, and move J Burner toward
discharge end to disengage from its orifice.
11. Carefully slide J Burner Assembly out of front
of broiler, taking care not to damage the Igniter
Assembly.
Air Box
Mounting Plate
Gas
Connection
Infrared Burner Assembly
12. Reverse procedure to install a new J Burner
Assembly.
NOTE:
Be sure J Burner input end engages the
gas orifice and that the discharge end of the J
Burner sits securely in the burner bracket.
Air Box
Mounting Plate
Gas
Connection
Lower J Burner Assembly