Dorner Mfg. Corp.
30
851-899 Rev. A
FlexMove FC (105 mm) Conveyor System
Installation
FGRF- 42x18V Spacer Assembly
1. Attach the spacer
onto
FGRF- 42x18V
and install correct
length T-bolt
.
Figure 97
Figure 97
2. Attach the bracket onto conveyor beam and tighten with
a socket wrench
.
Figure 98
Figure 98
FGRB- 40x18, FGRB- 40x20 and
FGRB- 40x15x20 Guide Rail Bracket
Assembly
Method 1
1. Open the upper and lower caps
on
, and
install T-bolt.
Figure 99
Figure 99
2. Attach the bracket onto conveyor beam and tighten with
a socket wrench
. Install upper and
lower caps.
Figure 100
Figure 100
1
2
3
1
1
1
2
1