Dorner Mfg. Corp.
52
851-899 Rev. A
FlexMove FC (105 mm) Conveyor System
Preventive Maintenance and Adjustment
5. Install wear bar assembly
with
four socket head screws
.
Figure 172
Figure 172
6. Guide belt
through idler assembly
with belt routing under gear
and
over wear tube
.
Figure 173
Figure 173
7. Bring ends of belt together and install pin
174, item 1)
.
Figure 174
Figure 174
8. Install pinch guard
with two
socket head screws
.
Figure 175
Figure 175
2
1
2
1
2
3
1
1
2
2