Dorner Mfg. Corp.
FlexMove FC (105 mm) Conveyor System
Installation
Hand Tools
• Wrench
• Slide rail cutter
• Set of metric hex keys
• Counter sink bit
• Drill fixtures for slide rail
• Riveting tool
• In addition, the tools listed below can be useful:
- Files
- Socket wrench
- Screwdriver
- Pliers
- Knife (burr of slide rail)
- Flush cutting pliers
- Soft head hammer
- Chain tools (for chain installation and dismantle)
- Level
Power Tools
• Hand drill
• Drill bit (for fixing slide rail)
Fasteners
Standard Fasteners
:
• M8 = Washer, Countersink Cap Screw, Nut, Lock Nut
• M6 = Washer, Countersink Cap Screw, Nut, Lock Nut
Figure 3
Figure 3
Square Nut
Square nuts
can be slid into T-slot of FlexMove
conveyor and support beams. They do not stay in place in
vertical positions and have to be inserted from the end of
beam. Remember to put in a sufficient number before
completing the assembly.
Figure 4
Figure 4
Spring Nuts
Spring nuts
can be inserted into the T-slot of
FlexMove conveyors and support beams. They do not stay in
place in vertical positions.
Figure 5
Figure 5
Connecting Strip
Connecting strips
are used for joining end to end
of beams. Use hex key and set screws when attaching the
connecting strip to the beam.
Figure 6
Figure 6