
Installation
55
GUARD S Wideline set
The handle is attached by screwing it all the way through with two or three
long screws from the inside of the door. The following is a description and
illustration of attachment with a three-point screw connection. In the case of a
two-point screw connection, the top screw connection is omitted. The
procedure is identical apart from that.
ATTENTION!
Failure of the security function with a two-point screw
connection.
Only use the two-point screw connection if the security
function is not required.
Before attaching the handle, you must attach the spindle to the handle.
The lever handle is assembled on the electronic handle at the factory.
The alignment of the lever handle is described from page 37 onwards.
A description of how to attach the spindle is provided from page 38
onwards.
A description of how to attach the spindle with reducing bushes is
provided from page 40 onwards.
ATTENTION!
Damage to the electronic components of the handle due to
contact possible.
Do not touch the electronic components of the handle.
Touch an earthed object made of metal to discharge any
electrostatic charge before continuing work.
A heater or tap are examples of suitable earthed objects.
Содержание GUARD S
Страница 96: ......