Environmental and Power Requirements
Moving the
System
If you need to move your system to a new environment, be sure
you are familiar with the environmental specifications and power
cord requirements.
Caution
Only qualified service persons should install the system.
Qualified service persons need not be Digital service
representatives, but they should have the technical
training and experience necessary:
•
To be aware of physical hazards to which they are
exposed in performing a task.
•
To take measures to minimize danger to themselves
and other persons.
Repositioning
the System
To reposition the system within the same environment, raise the
system leveler feet (shown in Figure 1–4) so that they no longer
touch the floor, and push the system to the new destination.
When you have positioned the system, lower the leveler feet to
the floor so that they hold the system stationary.
If you must ship your system to a new location, carefully
repackage it so that it can withstand the normal bumps or
shocks associated with moving.
Figure 1–4 Leveler Feet
MA00063
1–10 Basic Operation
Содержание AlphaServer 2000
Страница 4: ......
Страница 12: ......
Страница 18: ......
Страница 33: ...Turning the System On Figure 1 7 Power Up the System MA00016A 1 2 Basic Operation 1 15...
Страница 78: ...System Door and Cover Figure 2 5 Cover Removal MA00076 2 10 Hardware Components...
Страница 84: ......
Страница 132: ...SCSI Buses Figure 3 9 Preferred SCSI Cable Routing with SWXCR Controller MA00083 3 48 Options and Upgrades...
Страница 136: ...Power Supply Configurations Figure 3 11 I O Backplane Jumpers MA00088 J5 J3 J6 J5 J3 J6 1 2 3 52 Options and Upgrades...
Страница 168: ......
Страница 194: ......