
65
2. Installation and Setup
3. Performing the Initial Work
Important
Add an additional 12.5 ml of chelating reagent to the coolant if:
• It is easy for milling waste to adhere to the inside of the machine.
• The milling time exceeds 8 hours, regardless of whether milling waste adheres to the machine.
"
P. 61 “Step 1 : Filling the Coolant Tank”
MEMO
The ratios required to create approximately one liter of coolant are written on the label affixed close to the coolant
tank.
E
Fill the coolant tank with the coolant.
Do not exceed the MAX
indication.
F
After filling the tank with coolant, put the tray and lid on the coolant tank.