
01/2018
36 / 80
6159933780
Issue no: 09
CVIL II
7.7.4 - OUTPUT menu
Outputs
Name
Factory
config.
Comments
Cycle 1
acknowledgement
CYC1
X
Binary coding -weight 1. The cycle acknowledgement is sent back only if
it corresponds to a programmed cycle; otherwise it is at "0".
Cycle 2
acknowledgement
CYC2
X
Binary coding -weight 2. The cycle acknowledgement is sent back only if
it corresponds to a programmed cycle; otherwise it is at "0".
Cycle 4
acknowledgement
CYC4
X
Binary coding -weight 4. The cycle acknowledgement is sent back only if
it corresponds to a programmed cycle; otherwise it is at "0".
Cycle 8
acknowledgement
CYC8
X
Binary coding -weight 8. The cycle acknowledgement is sent back only if
it corresponds to a programmed cycle; otherwise it is at "0".
Cycle 16
acknowledgement
CYC16
Binary coding -weight 16. The cycle acknowledgement is sent back only
if it corresponds to a programmed cycle; otherwise it is at "0".
Pass Through
PTHRU
Allows the PLC to drive the output directly.
Maintenance
MAINT
In case a maintenance is requested (tool counter reached or
maintenance date).
Ready
READY
X
This signal is at "1" when the controller is in working order.
In cycle
INCYC
X
Response to the Start Cycle request. Drops to "0" at end of cycle.
Global report OK
ACCRP
X
Sent to the PLC when the cycle is over and the global report is OK.
Global report NOK REJRP
X
Sent to the PLC when the cycle is over and the global report is NOK.
Number of cycles
OK
NCYOK
X
This signal switches to "1" when the number of cycles run with an Accept
report is equal to the programmed number of cycles OK.
This output is reset after the "RP duration" time set in the
"Station - general parameters" menu.
Synchronization
SYNC
The synchronization signal falls down at the end of the phase and is
used, connected with synchronization of other controllers to synchronize
the next phase (see "Synchronizing several cvil controllers", page 52).
Torque report OK TOROK
Sent to the PLC when the cycle is over and the torque report is OK.
Torque report NOK TORNOK
Sent to the PLC when the cycle is over and the torque report is NOK.
Angle report OK
ANGOK
Sent to the PLC when the cycle is over and the angle report is OK.
Angle report NOK ANGNOK
Sent to the PLC when the cycle is over and the angle report is NOK.
Содержание CVIL II
Страница 2: ......
Страница 12: ...01 2018 12 80 6159933780 Issue no 09 CVIL II 4 2 2 Language selection 4 2 3 Setting the date and time...
Страница 77: ...01 2018 77 80 6159933780 Issue no 09 CVIL II...
Страница 78: ...01 2018 78 80 6159933780 Issue no 09 CVIL II...
Страница 79: ...01 2018 79 80 6159933780 Issue no 09 CVIL II...
Страница 80: ...www desouttertools com More Than Productivity Copyright 2016...