5 - 1 5
5
Installation and Wiring
L1
AC
INPUT
BYPASS
INPUT
(Rear View after
Rear Panel Removal)
PE (
) & GND (
)
Terminals for Top Wiring
PE (
) & GND (
)
Terminals for Bottom Wiring
)LJXUH:LULQJ7HUPLQDOVB*URXQGLQJ
2
For top wiring, remove the three top covers (2 screws for each cover); for bottom
wiring, remove the three bottom covers (2 nuts for each cover). See
)LJXUH
for the location of the top and bottom covers.
BATTERY
INPUT
UPS
OUTPUT
BYP
INPU
AC
INP
(Rear View after
Rear Panel Removal)
Bottom Cover × 3
(Each with
Two Nuts)
Top Cover × 3
(Each with
Two Screws)
)LJXUH/RFDWLRQRIWKH7RSDQG%RWWRP&RYHUV
Содержание DPH-300K
Страница 8: ......
Страница 14: ......
Страница 60: ......
Страница 76: ......
Страница 227: ...8 1 8 Optional Accessories 8 Optional Accessories ...
Страница 230: ......
Страница 231: ...9 1 9 Maintenance Maintenance ...
Страница 233: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1 A1 ...
Страница 236: ......
Страница 237: ...A2 1 Appendix 2 Warranty Warranty A2 A2 ...
Страница 240: ... ...