5 - 2 7
5
Installation and Wiring
NOTE:
*
1
The suggested manufacturer is K.S. TERMINALS INC. You may use equivalent
terminals provided by other manufacturers.
Protective Earthing
Load Grounding
Load Grounding
External
Battery
Cabinet
External
Battery
Cabinet
Load
External
Distribution Panel
UPS
Load
UPS
External Battery Cabinet Grounding
External Battery Cabinet Grounding
UPS Grounding
UPS Grounding
)LJXUH*URXQGLQJ'LDJUDPB3DUDOOHO8QLWV
WARNING:
%HIRUHVWDUWXSRIWKHSDUDOOHOXQLWVTXDOL¿HGVHUYLFHSHUVRQQHOPXVWVHW
each UPS’s '
Parallel Group ID
' (1 or 2) and '
Parallel ID
' (1~8) through
the LCD. Otherwise, the parallel UPSs cannot be started. Please refer to
3DUDOOHO6HWWLQJ
.
y
Dual Input (Parallel Units)
When there are two AC power sources, parallel units wiring procedures are as follows.
1
Follow
6LQJOH,QSXWWR'XDO,QSXW0RGLILFDWLRQ
to modify the UPS from
single input to dual input.
2
Refer to the procedures
1
~
6
stated in the section of
6LQJOH,QSXW6LQJOH
8QLW
.
3
Connect the cables of the main AC source, bypass source, output and external
battery cabinet(s) to the UPS. There are two types of wiring, top wiring and bottom
wiring. Please refer to the following to perform wiring.
7DEOH:LULQJ7HUPLQDOV :LULQJ,QIRUPDWLRQ
)LJXUH6LQJOH8QLW'XDO,QSXW7RS:LULQJ'LDJUDPB6WHS
)LJXUH6LQJOH8QLW'XDO,QSXW7RS:LULQJ'LDJUDPB6WHS
)LJXUH6LQJOH8QLW'XDO,QSXW%RWWRP:LULQJ'LDJUDPB6WHS
)LJXUH6LQJOH8QLW'XDO,QSXW%RWWRP:LULQJ'LDJUDPB6WHS
)LJXUH3DUDOOHO8QLWV'XDO,QSXW:LULQJ'LDJUDP
([WHUQDO%DWWHU\&DELQHW&RQQHFWLRQ:DUQLQJV
Содержание DPH-300K
Страница 8: ......
Страница 14: ......
Страница 60: ......
Страница 76: ......
Страница 227: ...8 1 8 Optional Accessories 8 Optional Accessories ...
Страница 230: ......
Страница 231: ...9 1 9 Maintenance Maintenance ...
Страница 233: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1 A1 ...
Страница 236: ......
Страница 237: ...A2 1 Appendix 2 Warranty Warranty A2 A2 ...
Страница 240: ... ...