Maintenance ■ Additional Features
- 92 -
Data I/O ■ 096-0465-001C
Make copies of this chart
and post near your work
area.
Maintenance Schedule
This Maintenance Interval Chart below recommends intervals based on
single-shift daily usage. Information about the specified procedures and
intervals can be found on the pages referenced in the right column.
An asterisk (*) denotes optional equipment.
Date
completed
/ initials
Component
Action
(see precautions also, on page listed)
Page
Items to check Every Day
Every day
Sockets
Clean with dry compressed air. Check for wear;
replace if necessary. For HIC Socket Adapters, see
more information in customer letter
Cleaning HIC
Sockets
(PN 983-5053) on our web site
This link opens the PDF which lists
cautions and suggested items, such as Cleaning
brush (PN 5655500901) and ProGold Wipes
(PN 5705500902).
page
Every day
Input air pressure
Verify the input air pressure at the regulator is
within specifications and that it is constant, that is
the Nm3/min. [Normal Cubic Meter/min.] (SCFM )
must be stable. For specifications, see
Connecting
Air
on page
page
Содержание PSV5000
Страница 12: ......
Страница 36: ......
Страница 160: ......
Страница 161: ...Electrical Schematics for PSV5000 and Equipment ...
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......
Страница 176: ...PROGRAMMABLE MEDIA EXPERTS ...