6-6
E S P R E SS O “Z E RO BA R I STA” CO F F E E M AC H I N E S - O P E R AT I N G I N ST R U CT I O N S
GENERAL
SAFET
Y
GENERAL
DESCRIP
TION
USE
MAINTENANCE
TRANSP
OR
T AND
INS
TALLA
TION
6.4 BOILER WASHING
To be sure that hot water for the brewing process is always clean and drinkable, wash the boiler daily. To perform this operation, proceed
as follows:
•
Insert a hose (not supplied with the machine) into the drain nozzle for hot water. The other end is to be inserted inside an adequate
container or placed on a sink.
•
Open the fourth page of the main menu.
118°
08:15
Washing
Gr
o
up
Washing
Boiler
•
Press the icone
to wash the boiler.
•
The machine will perform a washing cycle of the boiler which lasts approximately 30 minutes. It is recommended to run this cycle at
the end of the working day.
DANGER
Make sure that the hose used to drain hot water is secured and cannot move. Risk of burns.
Содержание ZERO BARISTA
Страница 1: ...ESPRESSO COFFEE MACHINES ZERO BARISTA TRANSLATION OF ISTRUZIONI ORIGINALI eng OPERATING INSTRUCTIONS ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 13: ...1 1 CHAPTER 1 GENERAL GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 1 GENERAL ...
Страница 17: ...2 1 CHAPTER 2 SAFETY GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 2 SAFETY ...
Страница 37: ...5 1 CHAPTER 5 USE GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 5 USE ...
Страница 85: ......
Страница 86: ...Via ZAMBELETTI 10 20021 Baranzate MI Italy T 39 02 454 865 43 info dallacorte com www dallacorte com ...