6-5
C H A PT E R 6 - M A I N T E N A N C E
GENERAL
SAFET
Y
GENERAL
DESCRIP
TION
USE
MAINTENANCE
TRANSP
OR
T AND
INS
TALLA
TION
•
Open the fourth page of the main menu.
118°
08:15
Washing
Gr
o
up
Washing
Boiler
•
Press the icon
to run the group washing cycle. The machine performs a washing cycle of the circuit which lasts approximately
3 minutes.
•
Do the same for the other 2 groups. Let a small quantity of water to flush out before reinstalling the portafilter and before starting
to use the machine.
Содержание ZERO BARISTA
Страница 1: ...ESPRESSO COFFEE MACHINES ZERO BARISTA TRANSLATION OF ISTRUZIONI ORIGINALI eng OPERATING INSTRUCTIONS ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 13: ...1 1 CHAPTER 1 GENERAL GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 1 GENERAL ...
Страница 17: ...2 1 CHAPTER 2 SAFETY GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 2 SAFETY ...
Страница 37: ...5 1 CHAPTER 5 USE GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 5 USE ...
Страница 85: ......
Страница 86: ...Via ZAMBELETTI 10 20021 Baranzate MI Italy T 39 02 454 865 43 info dallacorte com www dallacorte com ...