4-5
C H A PT E R 4 - T R A N S PO RT A N D I N STA L L AT I O N
GENERAL
SAFET
Y
GENERAL
DESCRIP
TION
USE
MAINTENANCE
TRANSPORT AND
INST
ALLA
TION
4.1.4
Connection to the water supply
The water supply line must be suitable for human consumption
according to the standards of the country of installation.
Provide a shut-off valve, which allows the supply source to be
disconnected.
Water arriving from the mains must be softened and have a
temperature of b5°C and +45°C.
In order to carry out water connection, proceed as follows:
1. Remove the cup support grid
(A)
.
2. Connect the machine to the water mains
(B)
by passing the loading pipe 3/8” (included in delivery) through the lower slot of the machine
(C)
.
3. Connect the drain pipe
(D)
(included in delivery) through the slot
(E)
.
4. Re-install the cup support grid
(A)
.
A
B
C
D
E
Содержание ZERO BARISTA
Страница 1: ...ESPRESSO COFFEE MACHINES ZERO BARISTA TRANSLATION OF ISTRUZIONI ORIGINALI eng OPERATING INSTRUCTIONS ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 13: ...1 1 CHAPTER 1 GENERAL GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 1 GENERAL ...
Страница 17: ...2 1 CHAPTER 2 SAFETY GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 2 SAFETY ...
Страница 37: ...5 1 CHAPTER 5 USE GENERAL SAFETY GENERAL DESCRIPTION USE MAINTENANCE TRANSPORT AND INSTALLATION 5 USE ...
Страница 85: ......
Страница 86: ...Via ZAMBELETTI 10 20021 Baranzate MI Italy T 39 02 454 865 43 info dallacorte com www dallacorte com ...