SiBE12-713
Control Specification
Function and Control
99
Checking the
current setting
data on the
microcomputer
memory
Those data can be checked by looking at the service monitor LED indicators, when the wiring
error checking is over, during forced operation, at the stop of the system.
The LED indicators stop flashing when the forced operation is over.
LED1…Room A wiring, LED2…Room B wiring
1st flashing LED…Port A piping, 2nd flashing LED…Port B piping
The first stay-on LED means the room that is connected with Port A. The next stay-on LED
means the one connected with Port B.
Example
Let's suppose the LED indicators are flashing as follows.
The above means that Port A is connected with Port B and Port B with Room A (or self-
corrected this way.)
L
E
D
A 1 2 3 4
Green Red
Green Red
Green Red
L
E
D
A 1 2 3 4
L
E
D
A 1 2 3 4
A
B
Wiring
Piping
Wiring
Piping
A
B
Содержание F-Series
Страница 1: ... Applied Models Inverter Multi Cooling Only Inverter Multi Heat Pump F Series SiBE12 713 ...
Страница 11: ...Introduction SiBE12 713 x ...
Страница 47: ...Specifications SiBE12 713 36 Specifications ...
Страница 113: ...Control Specification SiBE12 713 102 Function and Control ...
Страница 122: ...SiBE12 713 Instruction Operation Manual 111 FTK X S 20 25 35 C Names of parts Indoor Unit ...
Страница 235: ...Instruction SiBE12 713 224 Operation Manual ...
Страница 297: ...Check SiBE12 713 286 Service Diagnosis ...
Страница 316: ...SiBE12 713 Outdoor Unit Removal Procedure 305 Step Procedure Points ...
Страница 330: ...SiBE12 713 Others 319 Part 8 Others 1 Others 320 1 1 Test Run from the Remote Controller 320 1 2 Jumper Settings 321 ...