ESIE11-02
General Outline
1–9
3
1
4
5
(1)
: The table below contains the minimum water volume settings.
Oil type
Idemitsu FVC 68D
Oil charge volume
2.7 l
No. of circuits
1
Pump
No. x type
__
1 x Horizontal multi-stage end-suction
__
1 x Horizontal multi-stage end-suction
Model
__
CM5-3
__
CM5-3
Nominal static
height pump
__
232 kPa
__
217 kPa
Nominal static
height unit
__
138 kPa
__
105 kPa
Hydraulic components
Buffer tank
__
55 l
__
55 l
Unit water volume
3 l
3 l
59 l
3 l
4 l
60 l
Expansion vessel
__
12 l
__
12 l
Pre-pressure
expansion vessel
1.5 bar
1.5 bar
Safety valve
__
3 bar
__
3 bar
Dimensions
(h x w x d)
1450 x 1290 x 734 mm
Weight
Machine weight
245 kg
259 kg
271 kg
248 kg
262 kg
274 kg
Operation weight
248 kg
262 kg
330 kg
251 kg
265 kg
335 kg
Casing
Colour
Ivory white / Munsell code 5Y7.5/1 / ± RAL 7044
Material
Polyester coated galvanised steel plate
Sound power
level
(2)
78 dBA
Safety devices
■
Low-pressure switch
■
High-pressure switch
■
Pump motor overcurrent
■
Discharge temperature control
■
Outlet water temperature protection
■
Compressor motor overcurrent relay
■
Fan thermal protector
■
Anti-recycling and guard timer
■
Digital display controller with electronic temperature control
■
Reverse phase protector
■
Flow switch.
Model
EUWAN10KBZW1 EUWAP10KBZW1 EUWAB10KBZW1 EUWAN12KBZW1 EUWAP12KBZW1 EUWAB12KBZW1
Setting
EUWA*10-12KBZW1
The minimum water volume for standard thermostat difference setting
3 K
For reduced setting multiply this water volume by
3/new setting
Minimum allowable setting
0.1 K
Содержание EUWY 24KBZW1 Series
Страница 2: ......
Страница 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Страница 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Страница 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Страница 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Страница 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Страница 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Страница 210: ...ESIE11 02 4 Index 3 1 4 5...