ESIE11-02
Test Run and Operation Data
Part 4 – Commissioning and Test Run
4–31
3
4
5
1
Recommended fuses according to IEC standard 269-2: gL/gG (aM also admitted)
(F1U, F2U, F3U = gL/gG)
EUWAP10KBZW1
17.3 A
20.3 A
3 x 32 gL/gG
EUWAB10KBZW1
EUWAN12KBZW1
20.5 A
26.9 A
3 x 40 gL/gG
EUWAP12KBZW1
21.9 A
28.3 A
3 x 40 gL/gG
EUWAB12KBZW1
EUWAN16KBZW1
27.2 A
31.8 A
3 x 40 gL/gG
EUWAP16KBZW1
29.2 A
33.8 A
3 x 50 gL/gG
EUWAB16KBZW1
EUWAN20KBZW1
31.8 A
37.8 A
3 x 50 gL/gG
EUWAP20KBZW1
33.8 A
39.8 A
3 x 50 gL/gG
EUWAB20KBZW1
EUWAN24KBZW1
41.0 A
53.8 A
3 x 63 gL/gG
EUWAP24KBZW1
43.0 A
55.8 A
3 x 63 gL/gG
EUWAB24KBZW1
Unit
Nominal current
Maximum current
Fuses
Содержание EUWY 24KBZW1 Series
Страница 2: ......
Страница 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Страница 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Страница 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Страница 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Страница 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Страница 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Страница 210: ...ESIE11 02 4 Index 3 1 4 5...