Specifications
ESiEN09-06 A
10
Specifications
Notes:
Notes
(1) European/international technical standard setting the limits for voltage changers, voltage fluctuations and flicker in public low-voltage supply systems for
equipment with rated
75A.
(2) European/international technical standard setting the limits for harmonic currents produced by equipment connected to public low-voltage system with
input current > 16A and
75A per phase.
(3) Short-circuit power.
(4) System impedance.
ELECTRICAL SPECIFICATIONS
ERQ125A7W1B
ERQ200A7W1B
ERQ250A7W1B
-
MFA is used to select the circuit breaker and the ground fault circuit interrupter (earth
leakage circuit breaker).
-
MSC means the maximum current during start up of the compressor.
-
Maximum allowable voltage range variation between phases is 2%.
-
RLA is based on following conditions: indoor temperature: 27°CDB/19°CWB, outdoor
temperature: 35°CDB.
-
Select wire size based on the value of MCA or TOCA.
-
TOCA means the total value of each OC set.
-
Voltage range: units are suitable for use on electrical systems where voltage supplied
to unit terminal is not below or above listed range limits.
-
FLA means the full load amps of the fan motor.
-
In accordance with EN/IEC 61000-3-11
(1)
, respectively EN/IEC 61000-3-12
(2)
, it may
be necessary to consult the distribution network operator to ensure that the equipment
is connected only to a supply with Zsys
(4)
Zmax, respectively Ssc
(3)
minimum Ssc
value.
Содержание ERQ Series
Страница 2: ......
Страница 16: ...Combination Table ESiEN09 06 A 6 General Information...
Страница 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Страница 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Страница 58: ...Outline of Control ESiEN09 06 A 48 Function...
Страница 70: ...Wiring Diagram of Control Box ESiEN09 06 A 60 Control Box EKEQ CBV3 3 Wiring Diagram of Control Box 3 1 D box...
Страница 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Страница 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...