ESiEN09-06 A
Field Setting
Test Operation
119
(5.3) Y-control
Cooling: T
e set
- T
e real
= A
If A > B for C minutes, thermo off is applied for C minutes.
Heating: T
c real
- T
c set
= A
If A > B for C minutes, thermo off is applied for C minutes.
After C minutes, the units starts to operate.
(5.4) Z-control
Standard Daikin thermostat on/off control.
(6) Target Refrigerant Temperature Setting
(6.1) W-control
Cooling
T
e
target: T
e
zone - T pipe - T correction
INITIAL VALUE BASE ON ZONE
Adjustable by:
Mode n° setting
Setting switch n° Setting position n°
Setting
B (°C)
C (min)
51
2
00
2
3
01
4
3
02
6
3
03
8
3
04
2
5
05
4
5
06
6
5
07
8
5
08
2
7
09
4
7
10
6
7
11
8
7
12
2
10
13
4
10
14
6
10
15
8
10
T pipe = Tevapo - T coil AHU = at start 1,5°, T pipe = 0,5 ~ 11°C
T correction: field setting 21-1 (+1 ~ -2°C)
W-control
Setting
Description
Operation mode
01
02
03
04
Correction target T
e
21-1
0
2
3
Содержание ERQ Series
Страница 2: ......
Страница 16: ...Combination Table ESiEN09 06 A 6 General Information...
Страница 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Страница 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Страница 58: ...Outline of Control ESiEN09 06 A 48 Function...
Страница 70: ...Wiring Diagram of Control Box ESiEN09 06 A 60 Control Box EKEQ CBV3 3 Wiring Diagram of Control Box 3 1 D box...
Страница 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Страница 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...