Field Setting
ESiEN09-06 A
118
Test Operation
(5) Thermostat Control
(5.1) X-control
Thermo off/on:
When the DDC controller sends a voltage that is lower than 1,5 V, the unit stays thermostat off.
When the voltage is bigger than 1,5 V, the unit goes thermostat on.
(5.2) X-control
Thermo off
When the DDC controller maintains level A for more than B minutes, and the thermostat is on,
thermo off is carried out for at least C minutes. After C minutes, thermostat on-conditions are
checked.
Thermo on
When the DDC controller reaches level D or higher (lower for heating) and the thermostat is off
for at least C minutes (refer to thermo off conditions), thermostat on is carried out for at least E
minutes.
Mode n° setting
Setting switch n° Setting position n°
Setting
51
8
00
level A = 1 (cooling)
01
level A = 1 or 2 (cooling)
6
00
B = 3 min, C = 3 min
01
B = 5 min, C = 3 min
02
B = 7 min, C = 3 min
03
--
04
B = 3 min, C = 5 min
05
B = 5 min, C = 5 min
06
B = 7 min, C = 5 min
07
--
08
B = 3 min, C = 10 min
09
B = 5 min, C = 10 min
10
B = 7 min, C = 10 min
9
00
level A = 5 (heating)
04
level A = 4 or 5 (heating)
Mode n° setting
Setting switch n° Setting position n°
Setting
51
7
00
D = level 1 (cooling)
02
D = level 2 (cooling)
04
D = level 3 (cooling)
06
D = level 4 (cooling)
08
D = level 5 (cooling)
5
00
E = 3 min
01
E = 5 min
02
E = 10 min
b
00
D = level 1 (heating)
01
D = level 2 (heating)
02
D = level 3 (heating)
03
D = level 4 (heating)
04
D = level 5 (heating)
Содержание ERQ Series
Страница 2: ......
Страница 16: ...Combination Table ESiEN09 06 A 6 General Information...
Страница 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Страница 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Страница 58: ...Outline of Control ESiEN09 06 A 48 Function...
Страница 70: ...Wiring Diagram of Control Box ESiEN09 06 A 60 Control Box EKEQ CBV3 3 Wiring Diagram of Control Box 3 1 D box...
Страница 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Страница 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...