ESiEN09-06 A
Field Setting
Test Operation
131
No.
Setting item display
Setting condition display
Setting item
MODE
H1P
TEST
H2P
C/H selection
Low
noise
H6P
Demand
H7P
IND
H3P
Master
H4P
Slave
H5P
Factory set
0
Digital pressure
gauge kit display
Address
0
Binary number
1
(4 digits)
~
15
1
Cool / Heat
Unified address
Address
0
Binary number
1
(6 digits)
~
31
2
Low noise/demand
address
Address
0
Binary number
1
(6 digits)
~
31
3
Test operation
(Refer to the description
on page 180)
Test operation: ON
Test operation: OFF
5
AHU forced fan
Normal operation
Indoor forced fan H
6
AHU forced
operation
Normal operation
Indoor forced operation
10 Defrost changeover
setting
Quick defrost
Normal (factory setting)
Slow defrost
12 External low noise/
demand setting
External low noise/demand:
NO
External low noise/demand:
YES
18 High static pressure
setting
High static pressure setting:
OFF
High static pressure setting:
ON
19
Emergency
operation
(STD compressor is
inhibited to operate.)
OFF
STD 1, 2 operation: Inhibited
STD 2 operation: Inhibited
20
Additional refrigerant
charging operation
setting
Refrigerant charging: OFF
Refrigerant charging: ON
21
Refrigerant
recovery/vacuuming
mode setting
Refrigerant recovery / vacuuming: OFF
Refrigerant recovery / vacuuming: ON
22 Night-time low noise
setting
OFF
Level 1 (outdoor fan with 6 step or lower)
Level 2 (outdoor fan with 5 step or lower)
Level 3 (outdoor fan with 4 step or lower)
Содержание ERQ Series
Страница 2: ......
Страница 16: ...Combination Table ESiEN09 06 A 6 General Information...
Страница 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Страница 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Страница 58: ...Outline of Control ESiEN09 06 A 48 Function...
Страница 70: ...Wiring Diagram of Control Box ESiEN09 06 A 60 Control Box EKEQ CBV3 3 Wiring Diagram of Control Box 3 1 D box...
Страница 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Страница 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...