W-, X-, Y-, Z-Control
ESiEN09-06 A
58
Control Box EKEQ - CBV3
2.2.2 Target refrigerant temperature
Example, continued:
3 VDC = level 2, thus meaning an increase of the refrigerant target temperature. In heating
mode, this means T
c
+ 1°C. Logically, the room temperature will rise so at the next signal, we
are in level 3, where T
c
is kept even.
T
= room temp. - set temp.
2.3
Y-Control
Control of evaporating and condensing temperature (Te and Tc) by Daikin control (no DDC
needed).
Fixed T
e
or T
c
T
e
= user setting: -3 ~ 10°C
T
c
= user setting: 43 ~ 49°C
Components for control:
BRC1D (only for servicing)
++
Low cost
No BRC needed
--
No air temperature control
With Y-control, there is no external input to change T
e
/T
c
value. Their values can only be
changed by local setup with a Daikin remote controller (during installation). We refer to the
chapter “Field Setting” for further information.
2.4 Z-Control
Control of air temperature (T
s
or T
r
) by Daikin control (no DDC needed).
Components for control:
Air thermistor (Daikin)
BRC1D (Daikin)
KRP4A (Daikin option, remote on/off)
++
Low cost
--
BRC needed
No possibility for T
d
control
Cooling
Heating
T < 0
level 1 + level 2
DDC asks less capacity
DDC asks more capacity
T = 0
level 3
no change
no change
T > 0
level 4 + level 5
DDC asks more capacity
DDC asks less capacity
DDC
Control Box
X-control
0-10V
level 1
+2
level 2
+1
level 3
0
level 4
-1
level 5
-2
T
e+2
T
e+1
T
e
T
e-1
T
e-2
T
c+2
T
c+1
T
c
T
c-1
T
c-2
refrigerant
target temp.
cooling heating
Содержание ERQ Series
Страница 2: ......
Страница 16: ...Combination Table ESiEN09 06 A 6 General Information...
Страница 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Страница 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Страница 58: ...Outline of Control ESiEN09 06 A 48 Function...
Страница 70: ...Wiring Diagram of Control Box ESiEN09 06 A 60 Control Box EKEQ CBV3 3 Wiring Diagram of Control Box 3 1 D box...
Страница 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Страница 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...