17
Collective Zone
Zone Name
Office
Canteen
Meeting
1F
2F
3F
Air conditioner
group to be
started or
stopped
Screen 1 Monitoring
To start / stop the operation
of devices by group
1.
On Screen 1 Monitoring, select a zone
from the button
q
.
2.
Starting / Stopping Operation by the Zone
1
3
4
2
Select the zone of which the operation is
to be started / stopped as shown in
w
.
3.
Press the [Start] button
e
or [Stop]
button
r
.
Start or stop by zone the operation of groups
of air conditioners set in zones.
The example on the left shows a screen for
starting or stopping the operation of air
conditioners in the canteen.
[Procedure]