8
|
Piping installation
Installer reference guide
94
ERLA11~W1 + EBVH16SU23DJ
Daikin Altherma 3 R F
4P655196-1 – 2021.09
Counterclockwise to open
Clockwise to close
3
When the stop valve CANNOT be turned any further, stop turning.
4
Install the stop valve cover.
Result:
The valve is now open/closed.
To handle the stem cap
▪
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
▪
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Tightening torque (N∙m)
Stem cap, liquid side
13.5~16.5
Stem cap, gas side
22.5~27.5
To handle the service cap
▪
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
▪
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Tightening torque (N∙m)
Service port cap
11.5~13.9
8.2.8 To connect the refrigerant piping to the outdoor unit
▪
Piping length.
Keep field piping as short as possible.
▪
Piping protection.
Protect the field piping against physical damage.
1
Do the following:
▪
Remove the service cover (a) with screw (b).
▪
Remove the piping intake plate (c) with screws (d).
a
c
d
d
b
2
Choose a piping route (a, b, c or d).
Содержание Altherma 3 R F
Страница 309: ...13 13 ...
Страница 310: ......
Страница 311: ......
Страница 312: ...4P655196 1 2021 09 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...