9
|
Electrical installation
Installer reference guide
124
ERLA11~W1 + EBVH16SU23DJ
Daikin Altherma 3 R F
4P655196-1 – 2021.09
d
Fuse
OR
1N~
3N~
V3
W1
X1M
L N
1 2 3
1 2 3
L1 L2 L3 N
4
Fix the cables (power supply and interconnection cable) with a cable tie to the
stop valve attachment plate and route the wiring according to the illustration
above.
5
Choose a knockout hole and remove the knockout hole by tapping on the
attachment points with a flat head screwdriver and a hammer.
6
Route the wiring through the frame and connect the wiring to the frame at
the knockout hole.
Routing through the
frame
Choose one of the 3 possibilities:
a
a
a
2
3
1
a
Power supply cable
Note:
Route the interconnection cable together
Содержание Altherma 3 R F
Страница 309: ...13 13 ...
Страница 310: ......
Страница 311: ......
Страница 312: ...4P655196 1 2021 09 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...