7
|
Piping installation
Installer reference guide
77
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
7.3.7 To fill the domestic hot water tank
1
Open every hot water tap in turn to purge air from the system pipe work.
2
Open the cold water supply valve.
3
Close all water taps after all air is purged.
4
Check for water leaks.
5
Manually operate the field-installed pressure relief valve to ensure a free
water flow through the discharge pipe.
7.3.8 To check for water leaks
Before insulating the water piping, it is important to detect water leaks, in
particular small leaks. Small leaks can easily be overseen, but can cause damage to
the unit and surroundings over a longer period of time.
NOTICE
After water piping installation, check all connections for leaks.
7.3.9 To insulate the water piping
The piping in the complete water circuit MUST be insulated to prevent reduction of
the heating capacity.
Consider that the space heating piping can condensate during cooling operation.
Foresee adequate insulation for these pipes.
Содержание Altherma 3 GEO
Страница 1: ...Installer reference guide Daikin Altherma 3 GEO EGSAH06UDA9W EGSAH10UDA9W EGSAX06UDA9W EGSAX10UDA9W ...
Страница 248: ...11 11 ...
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...