8
|
Electrical installation
Installer reference guide
96
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
1
2
3
4
5
S6S
S7S
S8S
S9S
1×
2×
1
2
3
4
5
a
a
Installation of EKRP1AHTA is required.
3
Fix the cable with cable ties to the cable tie mountings.
8.2.10 To connect the safety thermostat (normally closed contact)
Wires: 2×0.75 mm²
Safety thermostat contact: 16 V DC detection (voltage supplied by PCB)
[9.8.1]=3 (
Benefit kWh power supply
=
Safety thermostat
)
1
"6.2.2 To open the indoor unit"
55]):
1
Top panel
1
3
2
2
User interface panel
3
Installer switch box cover
2
Connect the safety thermostat (normally closed) cable to the appropriate
terminals as shown in the illustration below.
Содержание Altherma 3 GEO
Страница 1: ...Installer reference guide Daikin Altherma 3 GEO EGSAH06UDA9W EGSAH10UDA9W EGSAX06UDA9W EGSAX10UDA9W ...
Страница 248: ...11 11 ...
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...