CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
RECORD OF REVISION
Date of issue: 2021-01-15
Revision No.: 25
0 - 5
Rev.
No.
Revision name
Changed pages
Issue date
Date and
signature
22
Redundant washer from landing
gear wheel deleted.
Caution for engine test updated.
New page 0-5 added.
Repairman (LS-M) or Mechanic
(A&P) was replaced by new
definition.
6-17, 6-18, 6-21, 7-1, 7-5, 7-
7, 7-9, 7-10, 8-1, 8-3, 8-7 to
8-9, 8-12 to 8-14, 8-22, 9-1,
9-8 to 9-10, 10-1, 10-2,
10-12, 10-13, 10-15, 10-16,
10-18, 10-19, 10-22, 10-23,
10-28, 10-29, 10-32, 11-1,
11-12, 11-13, 12-1, 12-2,
12-19 to 12-23, 12-25, 12-
26, 12-28 to 12-43, 12-45 to
12-50
2018-09-27
EASA Major
Change
Approval
10070985
17.9.2019
23
Inspection and lubrication of
Gerdes or ACS ignition switches
i to iv
0-5, 0-6,0-8, 0-9,
2-8,
12-2, 12-62 to 12-66
2020-01-15
EASA Minor
Change
Approval
10072846
18.03.2020
24
Airworthiness Limitation Section
(ALS) integration
i to iv
0-5, 0-6, 0-7, 0-8, 0-10
1-1, 1-4, 1-7, 1-8, 1-10, 1-
11, 1-12, 1-13, 1-14
2-1, 2-2, 2-3, 2-4, 2-5, 2-6,
2-7, 2-8, 2-9, 2-10, 2-11, 2-
12, 2-13, 2-14, 2-15, 2-16,
2-17, 2-18, 2-19, 2-20
3-1, 3-5, 3-6, 3-12
6-2
7-3, 7-7, 7-9
9-3, 9-5
10-1, 10-2, 10-10, 10-17,
10-18, 10-19, 10-35, 10-36,
10-37, 10-38
17-2, 17-3, 17-5
2020-11-19
EASA Major
Change
Approval
10075099
07.12.2020
25
PS-28N implementation
i to iv
0-5, 0-6, 0-7, 0-8, 0-9
1-5, 1-6
2-1, 2-2, 2-13
6-5
7-1, 7-4, 7-13, 7-14, 7-16
9-1, 9-6
10-1, 10-2, 10-6, 10-7, 10-9,
10-34, 10-35
11-1, 11-5, 11-7, 11-8, 11-9,
11-10, 11-15, 11-16, 11-17,
11-18, 11-19
12-1, 12-2, 12-6, 12-9,
12-12, 12-20, 12-21, 2-22,
12-24, 12-25, 12-56, 12-57,
12-59, 12-61, 12-62
2021-01-15
EASA Major
Change
Approval
EASA.A.546
26.04.2021
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...